The Contractor (Align JV) has identified a package of works for the supply and application of sprayed waterproofing on the newly constructed viaduct deck, associated with our works for the Colne Valley Viaduct construction. The scope of works will in ....
The pre-condition survey package comprises the inspection and survey of a number of buildings owned by third parties mostly private homeowners. The purpose of the surveys is to establish a baseline condition prior to tunnelling to protect Align, HS2 ....
HS2 C1 ALIGN JV - Towable Welfare Units
Buyer : align jv (bouygues travaux publics, volkerfitzpatrick and sir robert mcalpine)
The supply and delivery of 7 no. Towable Welfare Units. Specification: •7 No. Towable Welfare Unit (max. 2m wide) •Door to be repositioned on the back of the unit •To seat 6 No. people at a time •Drinking Water •Running hot & cold water • ....
HS2 C1 ALIGN JV - Amersham Highways Drainage (Supply & Install)
Buyer : ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)
Align requires a subcontractor to carryout the supply and install of highways drainage at our Amersham site.
HS2 C1 ALIGN JV - Amersham Gate Supply & Install
Buyer : ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)
The design, supply and installation of the Amersham gate. Note. All SHS are required to be galvanised before a PPC finish is applied.
HS2 C1 ALIGN JV - External Works Phase 2
Buyer : ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)
This is the external works phase 2 package for three of our shaft locations.
Supply and delivery of pre-cleaned and sorted knapped/snapped flint, all from the same quarry. oSurface area of the wall at Amersham that needs to be faced with flints is 766m2 . oGabion baskets require 222m3.
The below opportunity is for the supply, install and configure of wireless CCTV towers. This will be a mixture of CCTV, PTZ and bullet cameras. Supplier to configure and set up CCTV control room
To facilitate the construction of the Colne Valley Viaduct, Align JV had to construct a temporary Jetty over the various water courses around the Colne Valley region. This was formed of a tubular piled foundation, steel frame structure, and capped wi ....
The Contractor (Align JV) has identified a package of works for the supply and installation of Primary Steel associated with our works on the Chiltern Tunnels Shaft Head Houses and Portal Buildings. The scope of works will include the undertaking of ....