Awarded
778 Interdisciplinary STEM Teaching & Engagement Centre (ISTEC) Lot 5 Composite pre-cast concrete decking
Descriptions
A new Interdisciplinary STEM Teaching and Engagement Centre (ISTEC) will contain state-of-the-art laboratories for teaching undergraduate and postgraduate students. It will also support the University's schools, colleges and community outreach activities, while providing important facilities for industry and a platform for wider collaboration. The centre, which is being established at the University's Clifton campus, will be new build and enabling works are anticipated to commence Easter 2016 with construction following on to enable Practical Completion to be achieved in Summer 2017. The Interdisciplinary STEM Teaching & Engagement Centre project will be split into Lots which will be tendered on a staggered basis as and when documentation becomes available, through the Intend system. New Contract Notices will be issued for Lot/s when tendered. This Contract notice covers the following Lot 5 Composite steel pre-cast concrete decking WORK INCLUDES (but is not limited to): Primary Works •composite pre-cast concrete floor slabs, from first floor level, and roof (noted below) concreted by concrete contractor •composite roof slabs, designed to support plant and snow loadings. •framing to lift shafts (oversized to allow for range of lift installations), services shafts and stair-towers, including structural bracing to provide lateral stability to the building – to be noted if required •local strengthening of columns to allow omission of bracing, where required •allow for any movement joint requirements. •shelf angle connections to provide bearing on steel for composite decking, including movement joints •decking and staircases installed as work progresses. Secondary Works •trimming and cantilevered edge structures to floor voids and to upper levels •trimming and framing to lift shafts •trimming to apertures for services risers and roof penetrations, with upstand edge protection at roof level and fixed reinforcement mesh temporary infill across all floor openings, to prevent falls •trimmed openings for staircases, including temporary perimeter safety barriers •Any necessary supplementary steel or precast members in providing a full composite frame
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45000000 - Construction work
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors