Closed
ABLE MARINE ENERGY PARK - MAIN QUAY WORKS
Descriptions
The Contracting Entity is seeking to appoint a Principal Contractor to work with in order to deliver the design and construction of Able Marine Energy Park - Main Quay Works (the Works)., The Works will be procured on a Design and Construct basis utilising the FIDIC EPC & Turnkey Form of Contract with Particular Amendments to the standard clauses, of which further information will be provided within the procurement documentation., The first stage of the procurement will consist of the following:, - Standard Qualification Instruction to Suppliers (SQIS) document;, - Annexure A - Standard Selection Questionnaire (SSQ); and, - Annexure B - Draft Invitation to Negotiate(ITN)., The SSQ (Annexure A) is based upon the Crown Commercial Service standard template, and will be marked by an assessment panel using the process detailed in the SQIS., A maximum of 6 Suppliers will be selected to proceed to the Tender stage, and will be issued the full and final Invitation to Negotiate (ITN) document, of which a draft version is annexed to the SSQ for information and reference purposes., The Tender stage of procurement will be a competitive procedure with negotiation, to be conducted with the top 6 scoring Suppliers selected by the assessment panel and based upon the Suppliers SSQ response., The 6 Suppliers selected to tender will each be issued with the full and final Invitation to Negotiate (ITN) document., All completed Tenders must be submitted by the Tender Return Date stipulated in the procurement documents., Once received and validated, compliant tenders will be evaluated in order to ascertain a Preferred Contractor., The ITN will be evaluated on the basis of a 60% Quality and 40% Price weighting., The Preferred Contractor, once appointed, shall be responsible for the Design, Procurement, Delivery to Site, Off-Loading, Construction, Installation and Commissioning (including all testing) relating to his delivery of the Able Marine Energy Park - Main Quay Works (as described above II.1.4).
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71322000 - Engineering design services for the construction of civil engineering works
45240000 - Construction work for water projects
45241100 - Quay construction work
45252124 - Dredging and pumping works
Keywords
water infrastructure construction
hydraulic civil engineering
waterworks build
dam and reservoir works
canal construction
irrigation infrastructure
water reticulation civils
hydraulic structure build
marine water project works
freshwater engineering
quay construction
quay build
port quay works
berth quay civil works
quayside installation
harbor berth construction
waterfront quay building
ship mooring quay works
quay civil engineering
dockside quay installation
dredging and pumping
sludge removal
channel cleaning operations
sediment suction works
treatment plant dredging
pipeline dredge and pump
watercourse dredge services
silt pumping infrastructure
civil engineering design
infrastructure blueprint services
structural planning
public works engineering
road and bridge design
waterworks design
utility infrastructure planning
technical civil design
construction engineering consultancy
civil project technical design
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors