Awarded
AMP7/AMP8 Capital Programmes for Infrastructure and Non-Infrastructure Projects
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
TWUL are procuring design and build delivery capability for Infrastructure and non-Infrastructure projects. Essentially, TWUL recognises these as: Infrastructure – nominally the underground network of water mains and sewage: and Non-infrastructure – nominally all above ground plant, equipment, structures and process; the expected scope of works spans Thames Water’s water and wastewater infrastructure (network) and non-infrastructure (treatment) assets across the Thames Water region. The nature of the infrastructure scope broadly extends from rehabilitation, replacement and provision of new sewers and potable water pipelines to inspection and maintenance of aqueducts and tunnels. This will also include refurbishment, replacement and provision of new pumping station assets. Non-infrastructure scope includes refurbishment, replacement and provision of new potable water and wastewater treatment assets including service and storage reservoirs.
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45232451 - Drainage and surface works
45232431 - Wastewater pumping station
45232151 - Water-main refurbishment construction work
45232453 - Drains construction work
45232450 - Drainage construction works
45232430 - Water-treatment work
45232421 - Sewage treatment works
45232440 - Construction work for sewage pipes
45232423 - Sewage pumping stations construction work
45232422 - Sludge-treatment works
Keywords
water‑main refurbishment
pipeline renewal work
distribution main overhaul
trenchless water pipe restoration
aged water line replacement
potable water system upgrade
water main rehabilitation
pipeline renovation work
water supply refurbishment
infrastructure renewal work
sewage treatment plant construction
wastewater treatment infrastructure
effluent processing facility build
sewage purification works
treatment plant erection
biological treatment plant installation
sewage treatment station
water treatment works
effluent handling structure
wastewater purification build
sludge treatment plant build
biosolid processing facility construction
dewatering station installation
waste sludge handling plant
sludge thickening works
solid waste treatment infrastructure
sewage sludge disposal build
sludge-processing site construction
sludge management facility
biosolids treatment station
sewage pumping station build
wastewater lift station erection
sewage lift pump installation
pumping station infrastructure
sanitary pump site construction
effluent lift facility build
sewer pump house works
wastewater gravity bypass station
sewage lift unit build
pumping infrastructure
water treatment plant construction
potable water purification facility build
water-treatment infrastructure
filtration plant erection
treatment works installation
drinking water plant build
water purification works
treatment facility construction
water-processing infrastructure
clean water plant build
wastewater pump station build
effluent lift works
sewer pump station installation
drainage pumping facility construction
wastewater lift plant build
sub-surface pump station erection
wastewater pumping infrastructure
sewage pump unit construction
effluent transfer station
sewage pump works
sewage pipe build
sewer conduit installation
sub-surface sewage pipework
sewer line construction
drainage pipe erection
municipal sewage pipe installation
underground sewer conduit build
sewer main pipeline works
sanitation pipe construction
sewer network pipework
drainage system construction
surface water drainage build
stormwater channel installation
land drainage infrastructure
field drainage works
surface water control construction
drainage network build
storm drainage pipeline works
flood relief channel build
sub-surface drainage system works
drainage and surface works
stormwater channel construction
surface-level drainage build
roadway drainage installation
land surface water management
urban drainage shaping
ground-level surface works
flood mitigation channels
surface water conveyance
civil drainage and paving works
drains construction
trench drain building
channel-lined drain installation
surface drain excavation
road drain infrastructure
concrete drainage ditch build
linear drain works
road-side drainage construction
gutter channel build
roadway storm drain installation
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors