Awarded

Approved Installer List in relation to Scaling up Retrofit through Energy Company Obligations and the Great British Insulation Scheme

Descriptions

Birmingham City Council (the Council) wishes to create an Approved Installer List (AIL) of suitably experienced retrofit installation companies with specific expertise in delivery of Energy Company Obligations (ECO) and the Great British Insulation Scheme (GBIS). The Council anticipates appointing a maximum of five installers onto the AIL. The Council's ambition is that installers deliver retrofit measures across 3000 properties in the City of Birmingham per annum. Neither the Council nor households shall provide any funding towards the retrofit measures. The installers are required to deliver the retrofit improvement measures and apply for funding to the relevant organisations/body. The retrofit measures that are expected to be delivered by installers are those eligible through the ECO and GBIS programmes (the scope and measures will be flexible to accommodate future changes to the ECO/GBIS provisions or other Government led funded schemes of a similar energy company obligation nature). Through the Energy Company Obligations programme there is significant opportunity to increase fully funded investment into retrofitting the most inefficient homes of all tenures across the city. The Council is seeking to facilitate an increase in the number of properties which can be benefited through the schemes. The Council will be looking for retrofit improvements to be delivered to approx. 3,000 homes per annum. Installers will work City wide to maximise the delivery of high-quality retrofit through these schemes. The services required relate to all eligible tenures. Installers will be required to market, develop, deliver and manage a holistic service (from application to completion) for households. The retrofit measures that are expected to be delivered to Birmingham citizens by installers include, but are not limited to; insulation works, low carbon heating systems, renewable energy installations, heating system upgrades and repairs, windows and doors, draught proofing and other associated enabling building works. The Council is looking to secure an annual concession fee from each installer. This fee will be used to cover the Council's costs in targeting and promoting ECO and GBIS funded measures in Birmingham, verifying household eligibility and signing declarations etc. Installers and their supply chains will be required to actively participate in the achievement of the Council's social, economic and environmental objectives. Accordingly, contract documents may relate to social, economic and environmental considerations. The Council will be using its e-tendering system (in-tend) for the administration of this procurement process and bidders must register with the system to be able to participate in the procurement process. The web address is: https://in-tendhost.co.uk/birminghamcc Registration and use of In-tend is free. All correspondence for this procurement process must be via the I...

Timeline

Published Date :

19th Dec 2024 7 months ago

Deadline :

13th Sep 2024 10 months ago

Tender Awarded :

1 Supplier

Awarded date :

19th Dec 2024

Contract Start :

18th Nov 2024

Contract End :

31st Mar 2026

Tender Regions

Keywords

solar installation

PV system installation

solar panel setup

renewable installation

boiler installation

steam boiler unit

industrial boiler plant

boiler equipment

boiler mounting

boiler house

steam generation system

process boiler

heating boiler installation

boiler assembly

heat pump

ground-source heat pump

air-source heat pump

reversible heating unit

thermodynamic system

residential heat pump

split heat pump

inverter-driven pump

geothermal unit

heating and cooling pump

building alteration

structural modification

renovation works

interior remodeling

adaptive reuse

building retrofit

change of use construction

internal restructuring

refurbishment project

building conversion

electrical installation of heating systems

building heating electrics

HVAC electrical works

thermal equipment wiring

boiler electric installation

heating control circuits

plant heating electrics

building heating infrastructure

insulation work

thermal insulation installation

energy loss reduction

heat barrier fitting

building envelope insulation

thermal insulation work

heat-retention barrier install

insulating materials fitting

temperature-control insulation

HVAC installation

heating system fit-out

ventilation duct setup

air-conditioning system installation

central-heating system installation

boiler system fit-out

radiator pipework assembly

heating circuit setup

boiler room setup

boiler pipe connection

ventilation equipment installation

ductwork fitting

air exchange system install

airflow infrastructure build

HVAC ventilation setup

mechanical ventilation fitting

indoor air circulation installation

installation of doors and windows

frame fitting

threshold installation

glazing component setup

refurbishment work

building overhaul

interior/exterior renewal

cosmetic renovation

structural refurbishment

boiler startup calibration

heat load balancing

system pressure testing

thermostat commissioning

burner tuning

safety interlock test

system documentation handover

fuel efficiency validation

heating zone activation

commissioning report issuance

energy services

utility services

energy systems support

power services

utility management

energy efficiency

sustainable energy solutions

power systems services

energy infrastructure support

energy consultancy

building systems services

facility systems

building maintenance support

building operation services

MEP systems support

technical building services

facility systems management

building performance services

facility operations

building utilities services

building survey

structural inspection

condition survey

property surveying

building defect inspection

fabric survey services

building recording survey

structural monitoring

building asset survey

property condition report

site dismantling

plant decommissioning

apparatus shutdown

hazardous material clearing

facility deactivation

structural removal

equipment disposal

environmental remediation

safe demolition

asset retirement

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Awarded

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors