Closed
Asbestos Surveying - •Management survey (akin to the Type 2 survey) and Refurbishment/demolition sur
Descriptions
The contract is divided into 2 lotsLOT 1•the management survey (akin to the Type 2 survey) - designed to locate, as far as reasonably practicable, the presence and extent of ACMs, so that the Duty holder can prepare a plan for the management of asbestos LOT 2•the refurbishment/demolition survey (akin to the Type 3 survey) - a much more intrusive survey, designed to locate all the ACMs so they can be removed before the refurbishment (whether small scale or a large project) or demolition takes place. Aggressive inspection techniques will be required, so controls must be in place to prevent the spread of asbestos debris
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
79311000 - Survey services
79311300 - Survey analysis services
Keywords
survey services
questionnaire design
sample surveys
opinion surveys
data collection
field surveys
online surveys
telephone surveys
survey implementation
survey data gathering
survey analysis
data interpretation
survey data analytics
statistical survey reporting
quantitative analysis
results evaluation
survey findings synthesis
data modeling
respondent data processing
analysis of survey outcomes
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors