Awarded

Award of Caerphilly Silt Trap Maintenance and Bank Stabilisation Works

Descriptions

This is the award notice for the maintenance of the moat and bank stabilisation works at Caerphilly castle. The works were required as the silt trap at the inlet to the moat had become full, allowing silt to pass into the moat itself. The works involved excavating out accumulated material from the silt trap, dredging and restoration and strengthening of a section of bank.

Timeline

Published Date :

22nd Dec 2020 5 years ago

Deadline :

N/A

Contract Start :

N/A

Contract End :

N/A

Tender Regions

CPV Codes

Keywords

earth retention

sludge removal

retaining works

rock bolting

ground anchoring

levee build

embankment works

soil nailing

dike construction

stabilising foundations

treatment plant dredging

slope stabilisation

pipeline dredge and pump

shoreline levee works

sediment suction works

soil reinforcement

dyke installation

dredging and pumping

watercourse dredge services

flood embankment installation

ground-stabilisation work

silt pumping infrastructure

geotechnical stabilisation

earth embankment structures

coastal embankment construction

channel cleaning operations

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Awarded

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk