Awarded
Barry Fire Station Co-Location Works
Descriptions
South Wales Fire and Rescue Service are looking to appoint a contractor to carry out works to accommodate a co-location facility at Barry Fire Station.Concept design plans have been produced and will include the following work;oComplete strip out of first floor including all M&E.oFit out to the first floor to the new layout indicated.oUpgrade of external fabric to the main elevations to enhance finishes and appearance.oMinor extension to the rear of the appliance bay to include a new store. This being a load bearing masonry solution with heating, power, lighting and slab / foundation design.oStructural alternations to ensure existing waffle type slab remains in tack and roof supported. Structural works to also review the existing side walls at first floor with the potential for new wind posts as required.oNew M&E installation including upgrade to access control and fire alarm system.oNew fire escape stairoDrainage alterations internally to take new showers and WC’s at first floor and amended washrooms and kitchen at ground floor.oNew finishes throughout first floor and areas where alteration will occur at ground floor, namely kitchen / mess, offices, WC’s, showers, locker rooms, muster and drying room.oNew sliding folding partition at first floor including structural support.oUpgrade or new windows / doors as required.oNew sanitary ware and FFE as indicated.oNew lift installation including M&E and structural alterations.oAlteration of wall locations at ground floor that may prove to have load bearing properties.oExternal works as indicated to ensure maximisation of parking and altered access / egress proposal by re-aligning internal levels and kerbs to create a one way deployment route.oRe-surfacing works externally.oAllowance for provision of a new covered steel structure at the rear of the service yard.oUpgrades to external lighting.oReview of existing M&E loadings and recommendation for any upgrade works.Outline existing and proposed sketch plans are attached for reference.A design team has recently been appointed to carry out a fully coordinated detailed design and set of Employers Requirements for the purpose of the ITT stages. The team is as follows:Lawray Architects - Lead Consultant, Architect, Principle Designer and Contract AdministratorBingham Hall Partnership - Structural and Civil EngineersDRAC Consulting - Mechanical and Electrical ConsultantsTC Consult - Cost ConsultantThe client team consists of Estates representatives from both South Wales Fire and Rescue Service and Welsh Ambulance Service NHS Trust.
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45210000 - Building construction work
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors