Closed
Benmore Botanic Garden Avenue Phase 3
Descriptions
Benmore Botanic Garden is looking to have the following work carried out on the Giant Redwood Avenue by 31st March 2022. The expect work based upon current requirements is as follows Giant Redwood Avenue Raft Specification The Grass / Turf Area = 255 linear meters x 4.5m = 1,148 M2 Materials required to carry out the works are to supply and spread:- 10mm clean Crushed Rock, 100 mm depth = 115 cubic meters 8 mm to 2 mm clean blinding layer, 50 mm depth = 58 cubic meters Rootzone RZ 3 or RZ-USGA growing medium, 100 mm depth = 115 cubic meters All applications graded level Apply Pre seed fertiliser at the appropriate rate Apply shade tolerant grass seed at the appropriate rate. Recommended seed from Agrovista Please see below link – https://www.pitchcare.com/shop/pro-master-60-greenshade-grass-seeds-shaded-conditions.html Undertake the application of the 10mm gravel, 8mm to 2mm transition layer and the Rootzone layer plus the application of fertiliser and grass seed The grass area has already been Geo Injected at one meter centres. There is a requirement NOT to compact the injected areas. There is to be NO compaction to or driving on mulched areas.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors