Closed
Bilston Urban Village Advance Works Programme.
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Construction work. Site preparation work. Excavating and earthmoving work. Construction work for pipelines, communication and power lines. Construction, foundation and surface works for highways, roads. Construction work for highways, roads. Drainage construction works. Earthworks including contamination remediation, grouting of mineworkings, The Homes and Communities Agency (HCA) is procuring the construction of a new spine road, drainage and earthworks reprofiling to facilitate residential development.The contracting authority (HCA and Wolverhampton City Council) is looking to appoint a contractor who is able to construct the works comprising the following scope:Land Re-profiling:1. Excavation of former railway embankment to provide developable plots (for residential development).2. Engineered fill to provide development profiles (for residential development).3. Engineered fill to provide development profile (Open space south of Nettlefold Way and proposed school site).4. Removal and crushing of existing concrete slabs.Highway Works:5. Creation of new access junctions off Coseley Road, Highfields Road and Dudley Street.6. Creation of distributor roads linking Coseley Road to Highfields Road.7. Creation of a bus link, footway /cycleway to Dudley Street.8. Street lighting, drainage and safety measures to Bankfield Road.Drainage and Engineering:9. Strategic Surface Water drainage and attenuation.10. Strategic Foul Water drainage connections.Ground Engineering:11. Removal and replacement of the retaining wall at 9 Broadmoor Close with battered slope.12. Grouting of shallow mine workings under roads items 5 to 8 above.13. Treatment of mine shafts where required.The scheme is to be constructed to adoptable standards, including drainage works and utilities works to accommodate future development. Following construction, it will subsequently be adopted by the local authority.The works are to be fully designed by the Client's Consultant team as far as practicable.It is anticipated that the works will be carried out under an NEC ECC contract.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45112000 - Excavating and earthmoving work
45100000 - Site preparation work
45231000 - Construction work for pipelines, communication and power lines
45233000 - Construction, foundation and surface works for highways, roads
45000000 - Construction work
Keywords
grading
earthmoving
land clearing
site excavation
foundation prep
public works
demolition prep
mass excavation
building sites
structural work
earthworks
renovation work
cable line works
soil relocation
bulk earthwork
trenching
excavation
site grading
land shaping
site leveling
groundwork services
site preparation work
site construction
infrastructure projects
infrastructure flatworks
highway foundation works
construction work
construction services
civil engineering
preparatory works
civil road surface build
service line works
highway base structure
building construction
conduit installation
road surface laying
material handling
energy/pipeline line construction
pipeline installation work
excavating and earthmoving work
underground utilities build
utility line construction
road surface construction
road groundwork installation
roadbed and pavement build
multi-utility pipeline erection
subgrade and asphalt works
telecom/power line trenching
communications duct build
street foundation and surfacing
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :