Awarded
BIM 2022-026 - Supply of a hybrid energy system including renewable power sources integration
Descriptions
An Bord Iascaigh Mhara (BIM), a semi-State agency, wishes to invite tenders for the supply of a hybrid energy system, with the option of a capacity of 50kwh or 70kwh, for delivery to BIM in Co. Galway. The proposed system must be capable of accepting renewable power from 2 sources, receive power from a generator along with mains feed. The system must be capable of being monitored remotely and must also be capable to auto-starting the generator if storage in the batteries becomes low. The system performance must be remotely monitored and the use of technology to allow interrogation of renewables contribution along with generator runtimes must be available. Please refer to the enclosed Request for Tender (RFT) for detailed information.
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
31122000 - Generator units
31120000 - Generators
31161000 - Parts for electrical motors and generators
71314000 - Energy and related services
31100000 - Electric motors, generators and transformers
51111200 - Installation services of generators
51111000 - Installation services of electric motors, generators and transformers
Tender Lot Details
1 Tender Lot
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors