Closed
Boiler & Heating Plant Condition Survey 2020
Descriptions
The extent of the services are summarised as follows: - Carry out a full inspection and survey of the existing gas and/or biomass boiler, heating plant and associated pipework within each boiler room. - Inspect and review the existing fire alarm system within each boiler room to see if carbon monoxide detection in and/or around the boiler room can be provided rather than standalone detection and alarms. - Review the condition, suitability and compliance of the ‘as built’ installation of the above and provide an ‘Inspection Report’ for each boiler room. - Provide boiler room layout drawing and a schematic drawing for each boiler room. - Provide an overall ‘Tracker’ spreadsheet collating all finding across the full 43 number boiler rooms, as a “live” document. - Attend monthly progress meetings. - Provide a full suite of all 43 number Inspection Reports, all associated drawings and the Tracker spreadsheet on a suitably sized USB memory stick. A more detailed description of the services is included in the Invitation to Tender documents.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71321200 - Heating-system design services
71200000 - Architectural and related services
71250000 - Architectural, engineering and surveying services
71321000 - Engineering design services for mechanical and electrical installations for buildings
71320000 - Engineering design services
71000000 - Architectural, construction, engineering and inspection services
71300000 - Engineering services
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors