Awarded
Bournemouth Beach Management Groyne Building Programme 2017-2019
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Bournemouth Borough Council is seeking to appoint a contractor to construct an employer designed scheme comprising of the construction 12 (twelve) new timber groynes and the deconstruction of 12 (twelve) existing timber groynes. The construction works are part of a long-term project to renew coastal defences at the Bournemouth seafront and will provide ongoing coastal protection of assets and property from coastal erosion and damage. Due to the exposed nature of the site, the Contractor must ensure that sufficient resources are available to him at all times in order that he can complete the Works by the completion date using safe and reliable methods, experienced resources and effective management procedures The construction sequencing is given below. Phase 1 (16th October 2017 to 29th April 2018) - Works to commence no sooner than 16th October 2017 with sectional completion date of 29th April 2018 to construct 6 (six) new groynes (C51, C52, C53, C54, C55 & C56)and to deconstruct 6 (six) existing groynes numbered (B45, B46, B47, B48, B49 & B50) as shown on drawing number BBM-GRP-07, timber to be supplied by Bournemouth Borough Council Phase 2a (1st October 2018 to 24th February 2019) - Works to commence no sooner than 1st October2018 with completion date of 24th February 2019 to construct 3 (three) new groynes (C48, C49 & C50) and deconstruct 3 (three) existing groynes (B42, B43 & B44), timber to be supplied by Bournemouth Borough Council Phase 2b (1st October 2018 to 28th April 2019) - Works to commence no sooner than 1st October 2018 with completion date of 28th April 2019 to construct 3 (three) new groynes (C45, C46 & C47) and deconstruct 3(three) existing groynes (B39, B40 & B41)., timber to be supplied by Bournemouth Borough Council The contract commences on Monday 16 October 2017 and works are to be completed by Sunday 28 April 2019. A notice was sent to the European Journal regarding this opportunity on 28/06/2017.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45243000 - Coastal-defence works
45240000 - Construction work for water projects
45000000 - Construction work
71000000 - Architectural, construction, engineering and inspection services
Keywords
waterworks build
facility design
public works
maritime defence
building sites
structural work
renovation work
technical design
surveying
coastal reinforcement
site construction
sea defence structures
infrastructure projects
canal construction
construction work
structural engineering
construction services
civil engineering
dam and reservoir works
construction consultancy
planning consultancy
coastal defence works
shore stabilisation
building construction
shoreline protection
wave barrier works
freshwater engineering
architectural services
coastal engineering
inspection services
building engineering
coast protection projects
water reticulation civils
hydraulic structure build
hydraulic civil engineering
marine water project works
water infrastructure construction
irrigation infrastructure
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :