Open Closing in a 1 month

Broomhills Pavilion Upgrade

Descriptions

1 Site Location

Broomhills Pavilion is located adjacent to playing fields at the top of Broomhills Lane Repton DE65 6FS

The building is of brick and tile, single storey construction. Services provided are three phase electricity, water and sewerage. All existing room heating arrangements are to be retained.

It is envisaged that bidders will need to undertake a detailed inspection of the existing building. Details for the arrangement of site visits are given in section 5 below.

2 Scope of Supply

The contract will require the completion of all works associated with the following listed requirements.

2.1 Building

2.1.1 Inspect and repair any defective areas of the roof covering.

2.1.2 Replace all gutters and downpipes.

2.1.3 Replace Insulation.

2.1.4 Install thermal expansion joint in south wall and make good cracked brickwork.

2.1.5 Provide Wheel Chair Access to Main Door

2.1.6 Provide simple canopy over main entrance from entrance doors to the front of the building but not extending beyond building.

2.1.7 Entrance external light and switch with delay switch off

2.2 Plant & Equipment Room

2.2.1 Removal of existing plant & equipment providing hot and cold water to showers, washbasins and kitchen.

2.2.2 Provide a suitable energy efficient, electrical water heating arrangement to supply the refurbished building.

2.2.3 Provide lockable enclosure covering electric supply and main switches.

2.2.4 Modify old plant room to provide a change facility for Match Official with washbasin, toilet etc.

2.2.5 Install tiling where appropriate and decorate throughout.

2.3 Main function room

(Existing electrical heating units to be retained)

2.3.1 Repair floorcovering as required.

2.3.2 Create serving counter to adjoining kitchen area with storage units under the counter.

2.3.3 Make good all surfaces.

2.3.4 Replace skirting and architraves where necessary.

2.3.5 Replace frosted Glass in double doors upper sections with suitable clear glass

2.3.6 Provide window in west wall (2.5m x 1.2m) double glazed glass, lockable.

2.3.7 Decorate throughout.

2.4 Kitchen

2.4.1 Replace all units and provide double sink, large frig and dishwasher only. (No cooking appliances required)

2.4.2 Units to include one tall cupboard suitable for cleaning apparatus and equipment.

2.4.2 Install tiling where appropriate and decorate throughout.

2.5 Reception area

2.5.1 Remove existing cupboards.

2.5.2 Make good all surfaces.

2.5.3 Replace internal doors with safety glass and compliant fire-resistant doors as required.

2.5.4 Provide tall lockable storage cupboard for RPC use, to south of main doors. To include a double electrical power socket. (CCTV recorder position)

2.5.5 Decorate throughout.

2.6 Toilets

2.6.1 Remove existing toilets and replace with two accessible toilets in each block, to include required ventilation. (FA Guidance)

2.6.2 Tile as required and decorate throughout.

2.7 Shower & Changing Rooms

2.7.1 Provide proposals for a modern shower installation to replace existing arrangements.

2.7.2 Refurbish existing tiled floors.

2.7.3 Install suitable ventilation.

2.7.4 Install / repair tiling where appropriate.

2.7.5 Make good ceilings suitable for shower / changing room environment.

2.7.6 Provide small key lockable box / safe for each changing room.

2.7.7 Decorate throughout.

2.8 Electrical

(note current emergency lighting system and safety equipment is considered satisfactory)

2.8.1 Ensure existing electrical installation and wiring meets current building standards and IEE regulations, replace and rewire as necessary.

2.8.2 Beyond the requirements listed above, ensure there are double 13 Amp sockets - two in east side wall of the main function room, two on main function room wall next to the entrance, one on west wall of main function room (one suitable for use on the new counter, two on each long wall of the kitchen,

2.8.3 Replace all lights with LED lights as required.

2.8.4 Provide ducting / cabling / terminal boxes for potential CCTV cameras and LED lights at the four corners of the building to the lockable cupboard in the reception area.

Timeline

Published Date :

15th Sep 2025 Yesterday

Deadline :

20th Oct 2025 in a 1 month

Contract Start :

1st Jan 2026

Contract End :

30th Apr 2026

Keywords

plumbing fixture repair

electrical wiring diagnostics

HVAC servicing

ventilation duct cleaning

boiler system tune

gas pipe leak fix

fire alarm system calibration

sanitary installation maintenance

heating pump service

water system overhaul

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Procedure :

N/A

Suitable for SME :

Yes

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors