Open in a 1 month
Building Decarbonisation Project at Marl Pits Leisure Centre, Rawtenstall
Descriptions
This tender is to cover the Energy Consultancy services for the development of RIBA Stage 4 designs and professional services required for the first of two Work Packages (WP). Work will be delivered over a two-year period with WP 1 (25/26) focused on design, planning and procurement and WP 2 (26/27) on delivery, installation, commissioning, and handover. WP 1 should be completed by January 2026 and WP2 should be completed by January 2027 Phase 1 - Pre-Construction Services (RIBA Stage 4) The initial appointment will be for the pre-construction services, which encompass the completion of RIBA Stage 4 (Technical Design). The contractor will be responsible for providing detailed designs, ensuring the buildability of the design, and contributing to cost estimation, planning, and risk identification during this phase. Phase 2 - Construction Works (RIBA Stage 5 and 6) The ITT also includes the potential for the appointed Contractor to undertake the construction works, which cover RIBA Stage 5 (Construction) and RIBA Stage 6 (Handover and Close Out). However, the appointment for these stages is not guaranteed at this point. Upon the completion of RIBA Stage 4, a formal review will be conducted to assess the Contractor's performance and the project's requirements. It is anticipated that the decision to proceed to WP2 will be made within 6 weeks from the completion of WP1.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71314300 - Energy-efficiency consultancy services
Tender Lot Details
1 Tender Lot
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors