Closed
Building Maintenance Works at Harris Primary Academy Beckenham Green
Descriptions
Harris Federation wishes to engage a contractor to undertake building maintenance works at Harris Primary Academy Beckenham Green: Description of Works:- -Provide scaffold access to roofs and all decorated external wood and metalwork etc. -Repairs to rooflights -Strip all unsound existing paint coatings from rainwater goods and external joinery (this includes all joinery at roof level which hasn't properly maintained for 30 years) -Joinery repairs to windows etc. at roof level -External redecoration -Replacement in total of a poorly designed outlet, internal rwp. and downpipe taking rainwater from the flat roof area above the lady's staff wc nearest the School Reception office -Renewal of non-compliant Fire Doors and fire-proofing to 2no glazed screens -Provision of magnetic holdback devices to 5 Fire Doors in conjunction with school Fire Alarm contractor -Alterations and installation of a new external Fire Escape door to the main school hall -Replacement of 3no classroom sinks that have asbestos pads -Replacement of 5 metres run of chain link fencing on boundary wall to St Georges Road -Installation of an ACO drain on the foot of the ramp to the left side of the School Entrance
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45340000 - Fencing, railing and safety equipment installation work
45330000 - Plumbing and sanitary works
45214200 - Construction work for school buildings
45260000 - Roof works and other special trade construction works
44221220 - Fire doors
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors