Closed
Carbon Reduction Eglwys Cybi Sant & Eglwys y Bedd
Descriptions
Following the success of the Isle of Anglesey County Council (IACC) bid for UK Government ‘Levelling-up’ (LUF) funding, Bangor Diocesan Board of Finance wishes to appoint either an architect or an engineer specialising in carbon reduction technologies to design, develop and oversee implementation of a carbon reduction scheme for both the church and the adjacent Eglwys y Bedd in line with the main scheme of reordering of the church and extension and conversion of the former chapel.Plans for these buildings originally included deployment of photovoltaic panels on the south-facing roof of the church and the installation of air-sourced heat pumps to feed newly-installed underfloor heating. However, it was not possible to work these plans up to RIBA 03 standard in time to include them in the main permissions applications when they were made prior to the grant application.However, these plans remain an important part of the deliverables of the LUF-funded project and the objectives of Llefa’r Cerrig | Stones Shout Out as a whole (in line with the Church in Wales’ commitment to NET-zero by 2030) and so we are seeking to appoint an additional architectural or engineering professional to complete these plans in parallel with the on-going development of the main plans.The appointed contractor will be expected to produce a scheme in collaboration with the architect appointed for the other works on site, Cadw, and other statutory bodes, and then develop these plans through RIBA Stage 03 and 04, including providing documentation for permissions applications, technical specifications and schemes of work for the tender process. Following the appointment of contractors, the work will become part of the total package of works on site, supervised by the main architect. In accordance with the LUF agreement, all LUF-funded works are required to be complete by the end of March 2025. The following outline programme is currently proposed:Development of scheme – April to May 2023Contractor Engagement – May to July 2023RIBA Stage 04 – July to October 2023Contractor Engagement – November to December 2023Mobilisation – January 2024On-site Implementation begins – February 2024Due to the tightness of the programme required by UK Government, all tenderers will need to demonstrate that they have sufficient business resilience to meet deadlines even in the case of staff illness or other absence, and tenders from sole traders will only be considered if the proposal makes specific reference to the engagement of additional support staff to ensure this.NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=130131.The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx.Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71310000 - Consultative engineering and construction services
71200000 - Architectural and related services
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors