Awarded
Carrington Infant School - Asbestos Removal
Descriptions
Phase one: 1. To arrange for the existing lights to be disconnected. 2. To strip, remove and dispose of the asbestos insulation board ceiling located within the storeroom and adjacent toilets. Work to be carried out within 2 enclosures but in parallel as the void above will likely be linked and shared. To vacuum, decontaminate and prepare for air testing. 3. To provide a UKAS accredited laboratory to carry out a 4 stage clearance test and to issue a certificate of reoccupation. Phase two: To supply and install 12.5mm plasterboard screwed up to the existing timberwork. To tape and fill the joints. To sand and prepare for decoration. All other gaps to be sealed with mastic. To supply and apply 2 coats of vinyl matt emulsion. To arrange for the replacement of the existing lights and reconnection.
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45000000 - Construction work
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors