Colwyn Bay Waterfront Project - Phase 1b Coastal Defences
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Conwy County Borough Council has awarded the below contract:Obtaining approximately 300,000 tonnes of sea dredged sand (nom. d50 = 0.2-0.4mm) from existing offshore licensed dredging areas, transporting it to the site by sea and placing it to profile on the beach at Colwyn Bay. Modification of existing low level rock structures on the foreshore, within the area to be recharged, and stockpiling of surplus material for use elsewhere along the Colwyn Bay frontage. Construction of low level rock toe along approximately 600m of existing sea wall frontage, using a combination of rock armour removed from the beach recharge area and imported rock armour material. Amendments to existing surface water discharge arrangements, as necessary, within the area to be recharged. Removal of 3No. existing timber and concrete pile / plank groynes. The above comprising the Phase 1b coastal defence works, must be completed within the 2012/13 financial year in order to meet grant funding conditions imposed on Conwy County Borough Council.The Colwyn Bay Waterfront Project represents a major redevelopment of the town’s seafront with overarching objectives being to:• Provide renewed coastal defences along the Waterfront to protect the residents and businesses of the town from the threat of the sea.• Integrate the renewed defences with environmental improvements along the promenade to provide a coordinated approach to delivery of the project, which maximises the regeneration potential of the scheme while also providing the necessary level of coastal protection.• Provide environmental improvements to the promenade to offer a modern, robust, sustainable and attractive public realm to draw new visitors to the area and coordinate with the Bay Life regeneration plan.The first element of the coastal defence renewal (Phase 1a) was delivered in 2010/11, and the Phase 1b works are to be carried out during the 2012/13 financial year.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45243400 - Beach-consolidation works
45243000 - Coastal-defence works
14211000 - Sand
45243200 - Breakwater construction work
45240000 - Construction work for water projects
45000000 - Construction work
45243500 - Sea defences construction work
45243300 - Sea wall construction work
Keywords
sand
waterworks build
public works
maritime defence
natural sand
building sites
structural work
sand nourishment
river sand
renovation work
quartz sand
dune restoration
coastal embankment walls
coastal reinforcement
construction sand
site construction
coastal barrier build
shoreline nourishment
maritime defence works
sea defence structures
infrastructure projects
canal construction
coastal beach repair
construction work
wave reflection barriers
sediment replenishment
maritime wall structures
construction services
civil engineering
dam and reservoir works
coastal wave protection
coastal seawall build
coastal defence works
storm surge wall install
shore stabilisation
rubble mound breakwater
beach reinforcement
marine breakwater build
sea defence walls
building construction
shore wall engineering
beach stabilisation
beachfront strengthening
shoreline protection
wave barrier works
freshwater engineering
coastal storm defence
sea barrier construction
coastal engineering
seawall and breakwater works
coast protection projects
water reticulation civils
beach consolidation works
wave break structure build
hydraulic structure build
breakwater construction work
offshore breakwater erection
hydraulic civil engineering
marine water project works
marine protection structures
water infrastructure construction
sea wall construction work
harbour breakwater installation
sea defences construction work
irrigation infrastructure
surf barrier construction
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :