Open in a 8 days
CUE & Butterfly House Decarbonisation
Descriptions
The Butterfly House and Centre for Understanding the Environment (CUE) are located within the wider Horniman Gardens site, which is a Grade II listed Park and Garden. The CUE was constructed in 1995 and was originally intended as a temporary structure with an expected lifespan of 20 years. The Butterfly House was constructed in 2016.
The Horniman wish to partner with a design and engineering supplier who will support the decarbonisation of the above listed buildings. Works include:
Design works in line with RIBA stages 3-6:
Main Designer role:
- developing the outline design.
- Determine the requirement on planning application and listed building consent.
- detailed design drawing package.
- prepare tender package and specifications for installation.
- evaluate tender package and monitor and report on the cost plan.
- appoint and manage the design team (M&E engineer, Structural engineer).
- coordinate with the design team.
- updating design while on site.
- coordinate design changes.
Project management and coordination:
- coordinating the design development approval between the design team, The Horniman team and Salix (distributors of Public Sector Decarbonisation Fund Phase 4).
- coordinating the works implementation & program between the museum team, the contractor and Salix.
Principal Designer under CDM and Building Regulations:
- Building control application preparation and submission.
- PD duties for both CDM and Building Regulations.
- PD duties for both CDM and Building Regs including the preparation and share of the Health and Safety File.
- Organise Building control visit and share information at key stages.
Contract Administrator (traditional route contract) or Employer's Agent (D&B contracts)
- responsible for administering the construction contract including (non- exhaustive list): drafting contract documents for execution, issuing instructions, considering claims for extension of time, issuing certificates interim certificates for payment, practical completion certificates, etc
Clarification list uploaded
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Tender Lot Details
1 Tender Lot
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors