Closed
DFI 3217295 – Shimna Flood Alleviation Scheme
Descriptions
The project is for the provision of Shimna Flood Alleviation Scheme. The Economic Operator Team (EOT) will complete the construction of a fluvial flood defence in Newcastle, with an envisaged construction period of 12 months. The flood defence extends both upstream and downstream from New Bridge on the Bryansford Road and is approximately a total length of 1.45 km comprising a combination of sheet pile flood walls (approx. 0.45 km), secant pile flood walls (approx 0.89 km) and piled earth embankments (approx. 0.11 km). The EOT will be responsible for the final detailed design of the secant piles and sheet piles. Additionally, the works include the demolition of a number of property boundary walls and fences, the relocation of a drainage ditch, construction of new pathways, wall cladding, a retaining wall, back drainage, landscaping, the erection of a flood gate and River works to memorandum of information part B The EOT will also be responsible for landowner and stakeholder consultations ensuring necessary permissions, licences, permits, consents and approvals.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45200000 - Works for complete or part construction and civil engineering work
45240000 - Construction work for water projects
45262211 - Pile driving
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors