Duston Reservoir Footpaths
Descriptions
The project will be restore the surface integrity of the paths around Duston Reservoir. Approximately 2/3 of the path is 1.5m wide and is constructed in graded stone with a self-binding surface course. The remainder is bituminous construction, approximately 3.2m wide. The stone path requires siding out and a new surface course laying. Areas of the bituminous path require crack sealing. Other areas require reconstruction and edge strengthening. Other areas require inter-layer reinforcement & re-surfacing.
Principal quantities are:
Stone path resurfacing - Approximately 3800m2 self-binding gravel surface course.
Reconstruction of bituminous footpath - Approximately 250m2 at 150mm thickness, including approximately 90m of concrete edging.
Resurfacing of bituminous footpath - Plane out approximately 1500m2 to 25mm depth, reinforce with glass-fibre reinforcement grid and relay surface course.
Bituminous path crack sealing - Approximately 300m, 5-10mm crack width.
Other requirements:
Management and diversion of pedestrians and wheeled users during the works.
Undertaking the role of principal contractor.
Estimated contract programme:
Invitation of quotations - Late December 2025
Return of quotations - Mid February 2026
Contract Award Notice - Early March 2026
Award of Contract - Late March 2026
Works commencement Late April 2026
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45233160 - Paths and other metalled surfaces
45233161 - Footpath construction work
45233162 - Cycle path construction work
Keywords
metalled path work
paved walkway construction
surfaced footpath build
gravelled surface installation
communal path erection
recreational path surfacing
stone-surface pedestrian path
metalled cycle/foot corridor
rural path construction
surfaced route build
footpath build
pedestrian walkway installation
sidewalk construction
pavement surfacing
pedestrian path erection
walkway paving works
walkway network development
public footpath construction
sidewalk slab installation
curb path build
cycle path installation
bike lane surfacing
bicycle track build
cycleway construction
dedicated cycling infrastructure
commuter bike route build
urban cycle network path
bike trail surfacing
cycle corridor construction
pedalway build
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors