Closed

Dyffryn House Redevelopment - Design and Build of a Waste Transfer Station Facility

Descriptions

The Authority intends to construct a Waste Transfer Station (WTS) facility at the site of Dyffryn House, which is situated within the Dyffryn Industrial Estate, Ystrad Mynach. The site is located at National Grid Reference ST 151927, west of the A469 in Ystrad Mynach, Hengoed.Dyffryn House is a large portal-framed building, with two-storey offices on the front of the building (west side) and a single storey warehouse at the rear of the building (east side). Dyffryn House was constructed in the mid-1990s as a paper/magazine-printing centre under the ownership of St Ives.The WTS will be located in the south east quarter of the existing Dyffryn House building. The WTS will handle approximately 70,000 tonnes of waste per year from the region and will have a total annual capacity of up to 90,000 tonnes a year.Based on data from 2011/12, the 70,000 tonnes a year waste stream will comprise of:·Approximately 20,000 tonnes/year dry mixed recyclables (glass, mixed plastics, cardboard, paper, cans etc);·Approximately 15,000 tonnes/year of green and food waste;·Approximately 35,000 tonnes/year of residual waste (black bag waste).The separate waste streams will be transferred into larger bulk transporters and waste recovery will take place elsewhere. Waste will be removed from the site daily.A weighbridge will be located outside the Dyffryn House building for the use of refuse collection vehicles (RCVs) and bulk transporters.The construction of the existing building comprises wall cladding, roof cladding and an internal ground concrete slab. A condition survey of the existing building carried out in April 2013 established that the structure and the building fabric were in a good condition and there is no need to replace it.Mechanical services of the building are in reasonable condition for their age, it is likely however that some mechanical services, i.e compressed air system, hot and cold water systems, ventilation and drainage and possibly heating and fire hoses will have to be replaced to conform to the latest regulations? Most of the electrical services will have to be replaced.The current warehouse area of the Dyffryn House is proposed to be redeveloped so it accommodates a WTS in the south-east quarter of the building. The RCVs (and with them the waste) are proposed to enter/exit the site through the south entrance, and enter/exit Dyffryn House on the south-east corner of the building, nearest to the WTS area; therefore the presence of the waste is limited to the southeast corner of the building.The construction within the building will consist of:-The bitmac surfacing of the internal waste carriers access road;-The installation of a weighbridge;-The construction of reinforced concrete push walls;-The erection of a steel ramp.-Ancillary drainage works; and-Security fencing.The preferred method of procurement in this respect is via a design and build contract, it is anticipated that this facility will be fully operational by March 2016 and in order to achieve this timescale the Authority is working towards running a Pre Qualification Questionnaire (PQQ) exercise in March 2015 with the tendering process commencing in April 2015 with a goal of awarding this contract at the beginning of June 2015. The restricted procurement process will be undertaken in accordance with the Authority's Standing Orders for Contracts.NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at http://www.sell2wales.gov.uk/Search/Search_Switch.aspx?ID=21672.

Timeline

Published Date :

22nd Jan 2015 10 years ago

Deadline :

22nd Jan 2016 9 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

fire suppression system

fire extinguishing system

sprinkler systems

gas suppression systems

fire suppression installation

automatic fire suppression

suppression control equipment

emergency suppression systems

fire protection systems

fire system units

odor masking equipment

deodorization systems

odor control devices

industrial deodorisers

scent masking units

air quality reactors

construction works

civil engineering

building projects

infrastructure

public works

turnkey projects

structural construction

general contracting

site preparation

earthworks

building erection

new buildings

superstructure

commercial building works

residential construction

masonry

architectural building

shell construction

general building

weighbridge construction

vehicle scale platform build

truck weigh station erection

industrial weighing structure

weigh‑in‑motion bridge build

highway weighbridge installation

heavy‑vehicle scale platform

freight weigh station build

weigh‑station infrastructure

industrial weighbridge facility

landfill construction

refuse site build

solid waste disposal area

engineered landfill cell

tipping site construction

municipal dump site

waste containment area

sanitary landfill

disposal ground build

controlled waste site

waste-transfer station build

refuse depot construction

transfer station facility erection

waste handling hub build

municipal waste transfer infrastructure

sanitary waste depot build

refuse collection center construction

waste logistics station

garbage transfer facility

environmental waste hub build

ventilation equipment installation

ductwork fitting

air exchange system install

airflow infrastructure build

HVAC ventilation setup

mechanical ventilation fitting

indoor air circulation installation

motor install

pump mounting

HVAC system setup

switchgear commissioning

conveyor belt installation

generator wiring

control panel fitting

security system mount

compressor foundation alignment

electrical panel mount

vehicle weighing service

truck scale operation

axle-load measurement

weigh station management

commercial vehicle weigh-in

cargo weight verification

truck weighing facility

weighbridge calibration service

loaded-lorry weighing

weighbridge inspection

MEP design services

mechanical systems engineering

electrical design for buildings

HVAC design consultancy

building services engineering

M&E installation design

mechanical & electrical planning

energy systems design

technical services layouts

building engineering design

civil engineering design

infrastructure blueprint services

structural planning

public works engineering

road and bridge design

waterworks design

utility infrastructure planning

technical civil design

construction engineering consultancy

civil project technical design

M&E engineering

mechanical and electrical systems design

integrated M&E services

HVAC and electrical engineering

building systems engineering

M&E consultancy

mechanical‑electrical coordination

mechanical electrical installation

M&E technical services

M&E design and maintenance

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

CONTRACT

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors