Closed

East Antrim Future Energy — Heavy Duty Gas Turbine Selection.

Descriptions

For the Selection of an OEM Heavy Duty Gas Turbine capable of a capacity greater than 250MW (ISO) single unit, simple cycle on natural gas fuel suitable for a 50Hz grid.

Timeline

Published Date :

17th Jan 2017 8 years ago

Deadline :

24th Feb 2017 8 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

electricity

thermal energy

solar energy

nuclear energy

energy supply

power supply

utility power

grid electricity

energy

generator set

portable generator

industrial generator

backup generator

AC generator

DC generator

generator unit

power module

standby power unit

engine generator

auxiliary generator

steam turbine

turbine generator

condensing turbine

extraction turbine

industrial steam turbine

turbo-generator

back-pressure turbine

high-pressure turbine

steam-driven turbine

power station turbine

gas turbine

combustion turbine

aero-derivative turbine

industrial gas turbine

gas-driven turbine

power plant turbine

jet-engine turbine

combined-cycle turbine

gas power unit

gas turbine parts

turbine combustion chamber parts

aero-derivative turbine components

turbine rotor discs

turbine nozzle parts

Brayton cycle turbine parts

turbine casing segments

turbine blade assemblies

fuel injector parts

turbine maintenance components

gas generation units

gas production systems

industrial gas generators

gas supply generators

construction works

civil engineering

building projects

infrastructure

public works

turnkey projects

structural construction

general contracting

site preparation

earthworks

oil and gas construction

petroleum infrastructure build

gas field civil works

refinery plant erection

hydrocarbon processing site construction

offshore oil platform build

gas extraction facilities

petrochemical complex works

fuel processing infrastructure

drilling plant construction

electrical engineering installations

power system engineering

industrial electrical set-up

plant electrical engineering

technical electrical fitting

engineering-grade wiring works

complex electrical system installation

mechanical engineering installation

precision plant installation

heavy machinery integration

process equipment fitting

energy system integration

steam unit installation

turbine mounting

compressor assembly

burner fitting

thermal plant setup

pressure equipment installation

power machinery services

combustion technology setup

industrial energy device fitting

turbine housing assembly

rotor installation

shaft alignment services

generator coupling fitting

blade system setup

energy turbine mounting

mechanical turbine services

axial flow setup

rotating machinery fitting

kinetic power unit installation

gas turbine assembly

combustion turbine setup

high-efficiency turbine fitting

aero-derivative unit installation

turbo machinery integration

modular gas turbine installation

fast-start turbine setup

fuel combustion unit mounting

industrial gas drive system

thermal energy turbine setup

engineering advisory

technical consultancy

design review services

engineering project advice

systems consultancy

specialist engineering support

engineering feasibility advisory

technical problem-solving

engineering strategy services

expert engineering consultancy

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

CONTRACT

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors