Electric Vehicle Chargers with Solar Panels - Whitlock's End

Descriptions

Project Overview

This project is a key step to support the WMCA in delivering the West Midlands' transition to net zero, reducing transport emissions, and ensuring equitable access to EV infrastructure across all communities. It aims to help accelerate the rollout of Local Electric Vehicle Infrastructure (LEVI), particularly targeting the existing Park & Ride site at Whitlock End.

This project aims to deploy innovative, accessible, and scalable Electric Vehicle (EV) chargepoint solutions, with a focus on public engagement, data sharing, and long-term sustainability. It is likely to include the supply, installation, maintenance, software integration & data reporting of:

• 12 double socket 7kW EV chargers and

• ~400kW solar canopy (or ~100kW alternative, if the 400kW is problematic) power supply

Location

A link to proposed site can be found below:

https://www.google.com/maps/place/Whitlocks End Park and ride/@52.3911542,-1.8512999,19z/data=!4m6!3m5!1s0x4870b9ef97ff1943:0x7f1320bf59f898ff!8m2!3d52.3912608!4d-1.8511319!16s/g/11kk4w2_wd?entry=ttu&g_ep=EgoyMDI1MDcwOS4wIKXMDSoASAFQAw==

Commercial Model & Funding

It is planned that this LEVI Pilot will operate under a public-private partnership model, combining central government funding with local authority contributions and private sector investment. Suppliers will be expected to provide match funding, anticipated to be in the region of 64% of the total costs of assets installation, and demonstrate commercial viability to operate and maintain the assets under a concession contract of up to 15 years.

Technical & Operational Requirements

It is anticipated that:

· The successful supplier will meet the OZEV & PAS 1899 technical standards & specifications.

· The successful supplier will manage the grid connection process to completion.

· Data sharing and reporting are expected for the first five years of the contract.

In order to gauge market interest and help plan our procurement process, WMCA would be grateful if you could complete the form below to express your interest in this opportunity.

Please note, the information provided below is for information only and will not be assessed or form part of the tender process.

Completion of the form is voluntary and will not be used to limit competition in any way.

Timeline

Published Date :

8th Sep 2025 4 days ago

Deadline :

30th Sep 2025 in a 18 days

Contract Start :

31st May 2026

Contract End :

31st May 2041

Tender Regions

Keywords

electrical installation

building wiring

electrical systems fitting

internal power grid

circuit installation

electrical infrastructure

lighting and power setup

cable routing

electrical connection works

electrical network installation

vehicle repair service

fleet maintenance package

equipment servicing

mechanical repair team

brake system overhaul

suspension service

emergency roadside repair

vehicle diagnostics

mobile maintenance unit

parts replacement service

electrical panel mounting

wiring connection

cable tray installation

circuit breaker setup

outlet and switch fitting

meter board assembly

grounding rod installation

conduit routing

distribution board alignment

temporary power feed setup

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors