Awarded
Enabling Works - Groundworks & Civils
Descriptions
oSite clearance to Areas A, B & C for the installation of working platforms, haul roads and site welfare including management and disposal of all waste generated from site. oSurface vegetation clearance (de-veg) to enable access to permanent and temporary works locations. oRemoval of minor underground obstructions and foundations as required. oInstallation of ducting, pipework and drainage to and from the welfare facilities for the provision of power / services and removal of waste and foul water. oInstallation of small concrete bases for site survey control set up works. oExcavation/trimming of existing ground for installation of working platforms in areas A-C as per attached presentation slides. oInstallation of Pile mat/crane platform to Areas A, B & C. The subcontractor is to assume 400mm of 6F2 with 2 layers of geogrid. oInstallation of haul/access roads from the main compound down to the satellite site access following the alignment of the reception line. Existing ballast is to be removed and replaced with a designed haul road. The subcontractor is to assume 300mm of 6F2 with 2 layers of geogrid. oInstallation of compound hardstand area including foundations for welfare cabins and concrete footpaths. Subcontractor is to assume 2No. units double stacked (2x1x2) Suppliers will be required to have Constructionline Gold verification. If shortlisted, suppliers will be required to complete our internal PQQ form. The bids will be scored with a balanced scorecard approach that includes scoring on experience, resource, sustainability, health & safety, quality, and social value amongst other elements. VolkerFitzpatrick (VF) is the engineering and construction branch of the VolkerWessels Group, one of the leading engineering and construction companies in the UK. VolkerFitzpatrick have undertaken numerous major infrastructure projects across the UK such as HS2, Wembley Olympic Way, Stansted Airport, Brent Cross West Station and RAF bases Lossiemouth and Lakenheath. This overall project is working for BBVS JV at the Old Oak Common Station site. VF are undertaking the bridge demolition and replacement for the bridges over Old Oak Common Lane and the Central Line. VF will also be doing the temporary and permanent road lowering at Old Oak Common Lane. The overall programme is 2022-2028, to be done in 3 stages.
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors