Closed

Establishing Best Available Techniques (BAT) for hydrogen production from electrolysis of water

Descriptions

UK Environmental Regulators currently permit hydrogen production activities and it is our role to ensure that permits include appropriate measures to protect the environment. We do this by considering Best Available Techniques (BAT) at the permit determination stage, attaching conditions to the permits we issue, and by monitoring compliance with those conditions. Where there is no relevant existing BAT Reference documents, UK Environmental Regulators hold responsibility for development of such BAT for these installations which will be permitted under the Environmental Permitting Regulations (England and Wales) 2016, Pollution Prevention and Control (Scotland) Regulations 2012, and Pollution Prevention and Control (Industrial Emissions) Regulations (NI) 2013. We therefore wish to appoint a consultant to identify Best Available Techniques for hydrogen production from electrolysis of water (at all industrial scales anticipated) which are available for deployment in the UK.

Timeline

Published Date :

21st Sep 2021 3 years ago

Deadline :

8th Oct 2021 3 years ago

Contract Start :

15th Oct 2021

Contract End :

31st Mar 2022

Tender Regions

UK

CPV Codes

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors