Open Closing in a 5 days

Flood Defence Fence at Cherry Brook

Descriptions

Sixteen homes at the Cherrybrook Close scheme in Hope-Under-Dinmore, Herefordshire, have suffered significant flooding in recent years.

There is a brook that runs through the middle of the scheme behind the houses that front onto the main road.

 

The scheme is located at the end of a long road through Hope-Under-Dinmore within the local authority of Herefordshire Council. The homes are in an area where water has historically gravitated towards when there has been sustained and heavy rainfall before the water makes its way into the brook. The water travels from the south from higher ground and has impacted internally the 16 homes that are closest to the main road; these being 1-6, 9-10 and 31-38 Cherrybrook Close.

 

The properties to the rear of the scheme are on higher ground and so have not flooded internally up to this point.

 

The most recent floods in November 2024 prompted a full review of the flood strategy for this scheme and more in-depth discussions with Herefordshire Council about the wider impact of flooding on the area due to factors outside of Stonewater's control/ownership/responsibility.

 

Stonewater have been reviewing localised flood defence options and have settled on a product that provides protection to each home that has flooded internally in the past. The specifications are as follows:

- Low maintenance flood defence fence that is a minimum of 900mm high and would be guaranteed to keep out flood waters up to 900mm in height (seepage leakage rate must be declared)

- The fence is to be installed around the boundary of each property impacted by flooding

- There needs to be removable access panels for the driveways. These needs to be of a construction that residents can easily remove/slot in as required and that don't require machinery or contractors for day-to-day operation

- Circa 500 linear meters of fencing is expected to be required to protect the properties at highest risk

- Circa 15 removable driveway panels are required for access to the properties to be protected by the fencing

 

To view this notice, please click here:

https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=984654694

Timeline

Published Date :

3rd Oct 2025 11 days ago

Deadline :

19th Oct 2025 in a 5 days

Contract Start :

30th Nov 2025

Contract End :

31st Dec 2025

Tender Regions

Keywords

flood-prevention works

storm surge barrier installation

anti-flood infrastructure

levee system build

floodgate construction

overflow management works

water containment projects

river flood control

drainage prevention systems

flood defence engineering

flood-defences maintenance works

floodwall repair

levee reinforcement

flood barriers servicing

embankment upkeep

spillway maintenance

river defence rehabilitation

dam crest repair

protection structure maintenance

flood prevention system upkeep

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

PIN

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors