Awarded
Framework Agreement for Mechanical and Associated Works 2023-2025 (2027) for works up to a value of £500,000
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Wigan Council is seeking to procure a panel of contractors to be part of a framework agreement for mechanical and associated works for works up to a value of 500,000 GBP per project. The scope of works within this framework is mechanical and associated works - this includes, but is not limited to - - Boiler replacement, alterations to heating systems, pump replacement and the like - requirements for these works will arise in Lot 1 and Lot 2. - Decarbonisation works including Air Source Heat Pumps Lot 1 and 2, solar thermal PV Lot 1 and 2, Ground Source Heat Pumps Lot 2, Biomass Boilers Lot 2, and the like. To qualify for either Lot 1 or Lot 2, bidders must have the ability to deliver conventional Boiler heating related type works. Bidders must also have previously completed decarbonisation works - however, in respect of decarbonisation works evidence of experience will not be required for each individual technology or all workstreams. The framework agreement will consist of 2 lots. Lot 1 will deliver works up to a value of 150,000 GBP per project and Lot 2 will deliver works having a value of between 150,000 GBP and 500,000 GBP per project. All contractors appointed to the framework must be able to undertake projects to the upper project cost limit for the lot(s) to which they are applying. Individual contracts raised under the framework agreement can commence at any time during the period of the framework. The Framework Agreement will run for an initial period of 2 years and may be extended for two further periods of 12 months each. It is intended to appoint between 5 and 10 contractors per Lot. These will be the top 5 to 10 highest scoring bidders provided there are sufficient compliant and satisfactory responses received under the tender process. The framework agreement will be available for use by all directorates within Wigan Council and schools in the borough of Wigan. There will be potential for partner organisations and other areas of the Council to use the framework, as detailed within the Invitation to Tender documentation. The deadline for the submission of tender bids is Friday 27th January 2023 at 5pm. This Contract Notice was submitted for publication on the Find a Tender website on 9th December 2022 and published with reference number 2022 S 000-034878. Two subsequent F14 Notice for changes or additional information were published with reference numbers 2022 S 000-035100 -on 12th December 2022 and 2023 S 000-000555 on 9th December 2023.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71334000 - Mechanical and electrical engineering services
44622000 - Heat-recovery systems
45331000 - Heating, ventilation and air-conditioning installation work
45331110 - Boiler installation work
9332000 - Solar installation
45351000 - Mechanical engineering installation works
45333000 - Gas-fitting installation work
42511110 - Heat pumps
Keywords
LPG system setup
M&E consultancy
M&E engineering
boiler mounting
heat pump
geothermal unit
split heat pump
M&E technical services
ventilation duct setup
boiler installation
PV system installation
thermal recovery systems
residential heat pump
gas appliance fitting
heating system fit-out
HVAC installation
air heat recovery
renewable installation
boiler pipe connection
solar panel setup
gas fitting installation
ground-source heat pump
HVAC heat recovery
heat-recovery systems
waste heat systems
solar installation
integrated M&E services
thermodynamic system
boiler room setup
inverter-driven pump
flue-gas recovery
air-source heat pump
heating and cooling pump
heat recuperation units
kitchen gas line fitting
reversible heating unit
M&E design and maintenance
mechanical electrical coordination
mechanical and electrical systems design
process equipment fitting
domestic gas pipework installation
heavy machinery integration
heat recovery installations
mechanical electrical installation
energy-saving heat exchangers
mechanical engineering installation
natural gas equipment install
building systems engineering
industrial heat reclaim systems
gas safety valve installation
precision plant installation
air-conditioning system installation
HVAC and electrical engineering
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :