Closed
GB-Cambridge: UKRI-1654 Science Building 2 Cooling System Replacement
Descriptions
NOTE: This notice was updated on 27 October 2021 for the following reason: This notice was updated on 27 October 2021 for the following reason: *** THIS TENDER REQUIREMENT DID NOT RESULT IN AN AWARDED CONTRACT***(The goal of this project is to replace and update the air handling systems of our main laboratory suites. The Class 2 containment laboratories are split into two operational parts, utilising three air handling units. The existing air handling units are currently operational, but are at their life expectancy. In replacing the air handling units, we then have the option of changing from a glycol medium to a DX refrigerant medium for cooling and heating, as well as reaping the benefits of the increased efficiency of EC speed controllable fans etc. The air handling units which supply the laboratories are to be replaced with units which match the heating, cooling and volumetric airflow requirements of the laboratories. As the AHU's are handling 'Class 2 containment' lab air, new systems must be capable of achieving an air change rate and filtration process suitable for purpose. A maximum contract value of £180,000 is available for this contract.)
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
42512300 - HVAC packages
42520000 - Ventilation equipment
45331210 - Ventilation installation work
42512000 - Air-conditioning installations
Keywords
HVAC installation
climate control system
ducted air conditioning
central cooling unit
commercial AC setup
split AC installation
air-handling system
packaged AC unit
ventilation setup
chilled air distribution
packaged HVAC unit
rooftop AC system
compact HVAC solution
ducted heating and cooling
modular air-conditioning system
all-in-one climate unit
HVAC skid package
commercial HVAC package
integrated cooling unit
complete HVAC system
air handling unit
HVAC ventilator
exhaust fan
duct fan system
mechanical ventilation
forced air unit
axial fan
centrifugal blower
fume extractor
fresh air supply
ventilation equipment installation
ductwork fitting
air exchange system install
airflow infrastructure build
HVAC ventilation setup
mechanical ventilation fitting
indoor air circulation installation
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors