Closed
GB-Cambridge: UKRI-1654 Science Building 2 Cooling System Replacement
Descriptions
NOTE: This notice was updated on 27 October 2021 for the following reason: This notice was updated on 27 October 2021 for the following reason: *** THIS TENDER REQUIREMENT DID NOT RESULT IN AN AWARDED CONTRACT***(The goal of this project is to replace and update the air handling systems of our main laboratory suites. The Class 2 containment laboratories are split into two operational parts, utilising three air handling units. The existing air handling units are currently operational, but are at their life expectancy. In replacing the air handling units, we then have the option of changing from a glycol medium to a DX refrigerant medium for cooling and heating, as well as reaping the benefits of the increased efficiency of EC speed controllable fans etc. The air handling units which supply the laboratories are to be replaced with units which match the heating, cooling and volumetric airflow requirements of the laboratories. As the AHU's are handling 'Class 2 containment' lab air, new systems must be capable of achieving an air change rate and filtration process suitable for purpose. A maximum contract value of £180,000 is available for this contract.)
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
42512300 - HVAC packages
42520000 - Ventilation equipment
45331210 - Ventilation installation work
42512000 - Air-conditioning installations
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors