Awarded
GB-Edinburgh: Supply, Install and Commission Heat Pump - Firth View, Oban
Descriptions
NLB require an experienced contractor to supply, install and commission an air source heat pump at Firth View. The heat pump is to be installed as a drop-in replacement for the existing Worcester Bosch 40Cdi gas boiler. The heat pump should be installed in the approximate location of the existing boiler. The heat pump is required for central heating only. The Firth View complex consist of three traditional stone buildings that have been converted into offices. The main building which was originally a house and two outbuildings. During the conversion these buildings were insulated, and double glazing was installed. Drawing C-OBA/124 of the installed insulation is included within the quotation documents. Using tools provided by the PSDS it has been estimated that a 19kW heat pump will be required. However, this must be confirmed by a survey by the contractor during the site visit, a larger heat pump may be required. NLB will not be responsible for any associated costs for the site visit. Direct hot water will be supplied by electrical under tap water heaters, to be supplied and installed by the contractor.
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45331000 - Heating, ventilation and air-conditioning installation work
39715210 - Central-heating equipment
42511110 - Heat pumps
45331100 - Central-heating installation work
39715200 - Heating equipment
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors