Closed

GB-UK: Station Road Bridge Replacement Project

Descriptions

The London Borough of Haringey invites tenders from suitably experienced contractors for the replacement of a single span road bridge located in Station Road, Wood Green. The bridge is a single span road bridge carrying two lanes and two footways over the New River. The span is approximately 8m. The existing bridge deck is a composite construction of metal troughing and with an insitu concrete deck. The parapets are constructed purely in brickwork. It is proposed to replace the entire deck and parapets with new pre-stessed precast concrete beams with an insitu deck. The parapets will be constructed in brickwork with a reinforced insitu concrete core. It will be necessary to maintain at least a single flow of traffic and one footway for the duration of the works. It is envisaged that a temporary steel road bridge will be used to accommodate this need. The contractor will be responsible for all of the Traffic Management associated with this work. There will be a significant amount of services to be temporarily supported during the construction.

Timeline

Published Date :

17th Oct 2016 8 years ago

Deadline :

18th Nov 2016 8 years ago

Contract Start :

6th Mar 2017

Contract End :

25th Aug 2017

Tender Regions

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors