Closed

Generator Supply and HVO Fuel Management for The Cheltenham Ice Rink 2025/2026 (with option to extend for a further two years)

Descriptions

The Authority is seeking quotations from qualified Tenderer for the provision, installation, and technical support of a Stage V diesel generator (fuelled by Hydrotreated Vegetable Oil (HVO)) to be used as part of a hybrid power solution for the seasonal ice rink located in Imperial Gardens Cheltenham.

The generator will work in conjunction with the mains electricity supply and a battery energy storage system (BESS). This ITT outlines the technical and operational requirements for the generator system, including delivery logistics, integration, and support expectations.

Timeline

Published Date :

6th Aug 2025 2 months ago

Deadline :

26th Aug 2025 1 month ago

Contract Start :

14th Sep 2025

Contract End :

19th Jan 2026

Tender Regions

CPV Codes

Keywords

generator set

portable generator

industrial generator

backup generator

AC generator

DC generator

generator unit

power module

standby power unit

engine generator

auxiliary generator

generator set placement

fuel line connection

exhaust system install

grounding strap fitting

control panel wiring

load bank testing

generator fuel tank hookup

transfer switch install

battery charger connection

generator commissioning start-up

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors