Closed
Golborne Dale Bridge 0045 Water proofing by injection & Scour Protection Contract 2019
Descriptions
To carry out specialist injection waterproofing and scour protection to Golborne Dale Bridge 0045, in accordance with the performance specification and works information pack. The contractor will design and specify the system and product to satisfy the required performance specification. The material to be used is MC-Injekt GL-95 or similar approved, the contractor and their operatives must be licensed and approved by MC Building Chemicals to install this material. Bridge No 0045 requires the removal of 30m³ of silt from the South side and the installation of Rip Rap scour protection, along the full length of both the North and South abutments, using limestone boulders of between 400-600mm to extend 1m beyond the bridge. The Contractor to provide all necessary transport, tools and equipment and access, appropriate welfare , water disposal and clearance on completion in order to carry out the works effectively.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71500000 - Construction-related services
45200000 - Works for complete or part construction and civil engineering work
71300000 - Engineering services
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors