Closed
Habitat Surveys Blanket Bog SACs - Proposal for habitat surveys and condition assessments for blanket bog SACs in counties Galway, Mayo, Sligo, and Donegal
Descriptions
This request for tender seeks a suitable contractor to complete habitat surveys and condition assessments of blanket bog and associated habitats within 11 SACs in the northwest of Ireland (See Table 1). The contractor will classify habitats and record quadrats at pre-defined locations across these sites. Scope1.Location: A total of 11 sites should be surveyed over the course of the three years (2023-2025) in counties Galway, Mayo, Sligo and Donegal. A full list of the 11 sites is presented in Table 2. In 2023, habitat and condition assessment surveys will occur in 5 blanket bog SACs in counties Galway, Mayo and Donegal. These are Cloghernagore Bog and Glenveagh National Park SAC (Glenveagh NP only), Slieve Tooey/ Tormore Island/ Loughros Beg Bay SAC; Glenamoy Bog Complex SAC; Owenduff-Nephin Complex SAC (incl. Wild Nephin NP); and The Twelve Bens/ Garraun Complex SAC (Connemara NP only), as listed in Table 1. This is the maximum area to be surveyed in 2023, however, it is acceptable to survey less than this, provided it’s clearly demonstrated that the remaining project sites listed in Table 2 will be surveyed over 2024 and 2025.2.Extent The target area for 2023 is to survey a maximum of 5 of the 11 project sites within the WAN target area. This accounts for c.63,000 ha of blanket bog and associated habitats. The remaining project sites (c.73,000 ha) will be surveyed over 2024 and 2025.3.Timing: The habitat surveys will generally be run over the 5 month period (May-Sept) with completion of summary reports and GIS outputs by year end. From provisional work completed in 2022, the estimated rate of coverage is approximately 150 ha per day per surveyor.4.Communications and consultations: The contractor is expected to attend project start-up meeting with WAN to discuss project management details and any changes to methodologies and if necessary to review data requirements and agree data structures and standards, including GIS requirements. They should arrange consultations with regional NPWS staff, lando
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
90711500 - Environmental monitoring other than for construction
90714400 - Activity specific environmental auditing services
90711200 - Environmental standards other than for construction
90713000 - Environmental issues consultancy services
90722000 - Environmental rehabilitation
90714000 - Environmental auditing
90711400 - Environmental Impact Assessment EIA services other than for construction
90714500 - Environmental quality control services
90711000 - Environmental impact assessment other than for construction
90711300 - Environmental indicators analysis other than for construction
Keywords
EIA services
ecological impact studies
environmental risk analysis
biodiversity assessment
habitat impact review
impact statement preparation
sustainability evaluation
environmental screening
non-construction EIAs
ecological assessment reports
eco-standards development
environmental regulation guidance
compliance benchmarking
non-construction environmental criteria
regulatory thresholds setting
environmental norms consultation
sustainability standards
eco-compliance service
standard implementation
environmental threshold analysis
environmental metrics analysis
ecological data indicators
sustainability KPI measurement
non-construction environmental monitoring
eco-indicator evaluation
environmental performance assessment
ecological scoring
environmental benchmarking
data-based sustainability
indicator reporting
EIA preparation
environmental impact reporting
ecological consequence analysis
non-construction impact studies
EIA documentation
environmental effect evaluation
stakeholder assessment
environmental baseline studies
EIA planning
comprehensive EIA reports
air and water quality monitoring
ecological surveillance
biodiversity monitoring
non-construction environmental sampling
soil testing programs
ecosystem health monitoring
environmental trend analysis
field data collection
compliance monitoring
pollutant tracking
environmental consultancy
sustainability advice
ecological expert services
environmental impact advisory
green business consultancy
environmental risk consultancy
regulatory compliance services
eco-strategy consultancy
environmental policy support
nature preservation consultancy
environmental auditing
eco compliance audits
sustainability performance review
environmental risk assessment
green certification audits
regulatory environmental audits
eco-inspection services
sustainability auditing
emissions audit
environmental KPI reviews
specific activity environmental audits
project-level eco-assessment
on-site environmental audits
waste handling audit
water usage audit
greenhouse gas audit
biological hazard audit
construction activity audit
mobility audit
energy usage audit
environmental quality monitoring
emissions inspection
air and water quality control
pollution measurement services
ecological threshold testing
regulated discharge checking
environmental quality assurance
environmental parameter control
noise level monitoring
habitat quality services
ecosystem restoration
contaminated site cleanup
land reclamation
habitat re-establishment
degraded area recovery
wetland rehabilitation
ecological disturbance repair
reclamation planning
environmental renewal
eco-restoration services
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors