Awarded
Ham Street Woods NNR Track Surfacing
Descriptions
The main bridleway track (1000m) running through Ham Street Woods National Nature Reserve and SSSI to the south of Ashford in Kent (managed by Natural England) becomes very wet and muddy in winter due to the clay substrate. The aim of this project is to surface the Right of Way to provide for better public access and to facilitate forestry operations. The works are likely to take up to 3 weeks and need to be completed by the end of October at the very latest, but preferably starting by mid-September, before wet conditions set in.
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45232451 - Drainage and surface works
Keywords
drainage and surface works
stormwater channel construction
surface-level drainage build
roadway drainage installation
land surface water management
urban drainage shaping
ground-level surface works
flood mitigation channels
surface water conveyance
civil drainage and paving works
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors