Closed
Historic England Bristol office HVAC Upgrade project
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Historic England has decided that it would prefer a mechanical extraction system for all spaces that also does not recycle air, i.e. an extract system that exhaust outside of the building. In addition to this we would also like to fit a small air conditioning unit to out mezzanine space that is located above our kitchen area. In addition to the primary works noted above Historic England is also looking to upgrade the current 2 small air handling units to one main "intelligent" air handling unit that can be connected to a BMS system with supporting monitoring systems, to enable the system to be as efficient and as economical as possible in support of Historic England’s policy of moving towards a zero carbon model.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71321200 - Heating-system design services
45331000 - Heating, ventilation and air-conditioning installation work
39715210 - Central-heating equipment
45331100 - Central-heating installation work
71314310 - Heating engineering services for buildings
39715200 - Heating equipment
Keywords
ventilation duct setup
central heating design
HVAC heating solutions
heating plant design
heating circuit setup
heating system fit-out
HVAC installation
residential heaters
HVAC central systems
radiator components
boiler peripherals
heating equipment
heating system design
boiler design services
steam system engineering
boiler system fit-out
thermal system design
HVAC heating planning
heat distribution planning
heating load calculation services
central-heating system installation
commercial heating systems
district heating design consultancy
heating system engineering
radiator pipework assembly
boiler system engineering
residential heating engineering
heating infrastructure design
thermal heating consultancy
heating infrastructure engineering
central heating components
boiler installation planning
central heating equipment
air-conditioning system installation
building heating consultancy
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :