Closed
HS2 Main Works S1 & S2 - WP023 - Crane Maintenance
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Skanska Costain Strabag Joint Venture (SCSJV) are seeking supply chain partners to provide crane maintenance services for the HS2 Main Works Civils Contract Area Central. The Subcontractor provides all management, people, equipment, plant and materials, consumables (including fuels) and any other resources necessary to carry out and complete the items below. Timing of work to be agreed 4 weeks prior to planned commencement. LOLER thorough examination of each crane (e.g., https://www.hse.gov.uk/work-equipment-machinery/thorough-examinations-lifting-equipment.htm). Periodic LOLER thorough examination according to LOLER requirements Including but not limited to: Wear checks and measurements on brakes, ropes, mechanical and electrical components Visual inspections and functional checks of all components, including but not limited to brakes and safety devices All brakes are visually inspected thus ensuring that the brakes are working efficiently and without undue wear. Visual checks for defects - all components. Visual structural inspection of the crane. Non-destructive testing, load testing and other tests as deemed appropriate by the competent person. Disassembly or internal examination of parts as required to conduct the above examination items. Any other checks as specified by the manufacturer. Report of inspection as per LOLER requirements (e.g. LOLER Schedule 1: https://www.legislation.gov.uk/uksi/1998/2307/schedule/1/made). Immediate notification to Contractor of any defects noted to be a danger to people. Schedule of examinations to be every 6 months initially (following examination at commissioning) then adjusted as needed according to as per a competent person recommendation taking into account the work environment and historical findings. Adhoc inspections maybe required in the event of exceptional circumstances (e.g. damage). Bimonthly servicing (every two months). This may be adjusted should the servicing reports indicates more, or less frequent inspections are required. Upon completion a detailed report to be provided to the Contractor. Quote for remedial works associated with any defects identified to be provided. Servicing to consist, as a minimum, of the following: Wear and other defect checks of load ropes All safety devices are checked for correct operation and adjusted as required All electrical components are checked for wear, cleaned, and adjusted where necessary. All brakes are adjusted to the correct settings, thus ensuring that the brakes are working efficiently and without undue wear. All safety devices are checked for correct operation and adjusted if required. All mechanical components are checked for wear. Full lubrication program as per OEM and/ or industry recommendations Subcontractor to provide a breakdown response service which includes out of hours unscheduled onsite work and over the phone assistance. This service to be provided 24x7 unless otherwise agreed.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71353000 - Surface surveying services
79311000 - Survey services
71352000 - Subsurface surveying services
71315300 - Building surveying services
71355000 - Surveying services
38296000 - Surveying instruments
31682210 - Instrumentation and control equipment
Keywords
total stations
building survey
land surveying
data collection
boundary surveys
opinion surveys
land survey gear
sensor interface
borehole logging
RTK surveying
site measurement
online surveys
cavern mapping
survey tripods
condition survey
survey services
sample surveys
surface mapping
field surveys
cadastral topography
survey implementation
contour surveying
measurement device
subsurface surveying
surface feature mapping
underground mapping
telephone surveys
land parcel surveying
control equipment
property surveying
questionnaire design
structural inspection
structural monitoring
laser distance meters
building asset survey
surveying services
subsurface modeling
boundary surveying
survey data gathering
survey-grade mapping
geotechnical probing
process control unit
geodetic surveying
surface surveying
borehole surveying
spatial data collection
surveying instruments
geological logging
topographic surveys
fabric survey services
engineering surveys
digital terrain modeling
GNSS survey instruments
underground cavity detection
ground penetration surveys
topographical data collection
underground utility detection
property condition report
building defect inspection
soil stratigraphy analysis
building recording survey
instrumentation equipment
level transit instruments
subsurface feature mapping
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :