Closed
Installation of ASHP and PV System
Descriptions
Falmouth Exeter Plus (FXPlus) is looking to appoint a single contractor to carry out the Eco Block project in Glasney Parc Block A at the Penryn Campus, Penryn. The scope of work includes the following: • Decommissioning and removing/ making safe the existing gas-powered heating system. • Designing and installing an Air Source Heat Pump (ASHP) system to replace the current heating system. • Restoring any affected areas after installation to match the existing building design, ensuring compliance with building regulations and fire compartmentation requirements • Designing and installing a 40kWp (or higher capacity) photovoltaic (PV) system on the roof
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45315000 - Electrical installation work of heating and other electrical building-equipment
9331200 - Solar photovoltaic modules
39715200 - Heating equipment
Keywords
solar panels
PV modules
photovoltaic panels
solar electric panels
heating equipment
residential heaters
commercial heating systems
central heating components
electrical installation of heating systems
building heating electrics
HVAC electrical works
thermal equipment wiring
boiler electric installation
heating control circuits
plant heating electrics
building heating infrastructure
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors