Closed

ISO 11 Incinerator Life Extension Project - WP6 Diesel Tank Replacement

Descriptions

The contract is for a single supplier to provide Design and Build of Work Package 6 - Diesel fuel system upgrade and fuel tank replacement, as per the user requirement specification (URS) for The Pirbright Institute (Pirbright), Ash Road, Pirbright, Surrey, GU24 0NF. The scope of this contract is to replace the Diesel Fuel System to ensure that the ISO 11 incinerator remains available to operate, safe, reliable and will serve the building for a minimum of 10 years. The scope of works will involve: •Detailed design work for the new diesel tank system, with all calculations (tank sizing, pump sizing, pipe pressure loss, etc) •Supply, manufacture, delivery and installation of the new diesel tank system •Offline commissioning of the new diesel tank system oIt is a requirement that prior to connecting to existing pipework, the new diesel tank system proves that there is the required pressure up to the point of connection. •During the scheduled shutdown, the new diesel tank system is connected to existing pipework. •Final commissioning with the burners in operation. •On completion of commissioning, dismantle, remove and dispose of the existing diesel tank, all ancillaries and any redundant diesel fuel pipework. •Management of all subcontractors employed by the supplier to complete these works. •On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and should include all valves/components labelled with a schedule of components included. A separate section which provides details of the following oBrief Description of the works being carried out. oProject Risk Assessment. oKey structural principals. oHazardous materials used. oInformation on the future removal of installed plant. oH&S information about equipment provided for cleaning or maintaining installed plant. oThe nature, location and markings of significant services. oInformation and as built drawings of buildings, plant and equipment. oStep by step activities to carry out the works. oLesson Learnt, challenges met and how they were overcome. •As part of the works, the supplier should also provide the following: oProvision to ensure safe access and egress to any confined spaces (Gas monitors, Rescue Personnel, Outside Watchman, etc). This may not be applicable but needs to be considered. oAll provisions for the installation and deconstruction work, including but not limited to: All necessary machinery and equipment required for the works. Provision of lighting if needed during winter months Provision of transport vehicles required for the works which is not listed as part of the CDM site below. Provision of weather protection for any equipment and materials used/stored outside. All PPE required for safe working during all works.

Timeline

Published Date :

24th Sep 2024 in a 3 months

Deadline :

1st Nov 2024 in a 2 months

Contract Start :

9th Dec 2024

Contract End :

28th Nov 2025

CPV Codes

71310000 - Consultative engineering and construction services.

45000000 - Construction work.

44611410 - Oil-storage tanks.

71320000 - Engineering design services.

44611400 - Storage tanks.

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors