Closed

LCC 082/22 - FASTER Project - Provision of Rapid Electric Vehicle Charging Infrastructure along the border counties in Ireland

Descriptions

The FASTER project is a joint cross border project across Scotland, the border Counties of Ireland and Northern Ireland to support the overarching ambition to transition to low carbon transport systems and to demonstrate how each of the three jurisdictions can provide early systems learning in relation to the electrification of transport. This PIN notice relates only to the component of the FASTER project being undertaken by Louth County Council the provision of 25 rapid charge units across the border counties in the Republic of Ireland.There are a total of seven project partners and 15 associate partners from across the three jurisdictions. The partnership will implement the physical rollout of 73 rapid charging stations in the programme area. Led by East Border Region Ltd. the project has considered the common policy ambition across Scotland, Ireland, and Northern Ireland, which is to transition to a low carbon transport system between now and 2040. One of the main barriers to the take up of these electric vehicles is the lack of public charging infrastructure and in particular rapid charging locations. The project aims to ensure that the availability of charging stations is not a major obstacle to Electric Vehicle (EV) market penetration with the proposal to carry out the design, analysis, procurement, installation, and operation of 73 Rapid Chargers (60kw per charger with the capacity to deliver 120kw where only one car is connected to the charger) across the three programme jurisdictions. There must be cross compatibility between the three jurisdictions which may be achieved using contactless card payments or other methods.The FASTER project has been awarded funding for the project’s capital costs from the European Union’s INTERREG VA Programme, managed by the Special EU Programmes Body (SEUPB). Further information about the FASTER project can be found at www.fasterevcharge.com

Timeline

Published Date :

1st Jul 2022 3 years ago

Deadline :

8th Aug 2022 3 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

EV

motor install

turnkey projects

domestic wiring

conveyance items

charging device

electric vehicle

building wiring

public works

portable charger

internal cabling

panel mounting

logistics gear

lighting fixture

building sites

purity testing

structural work

infrastructure

recharger unit

site preparation

log file cleanup

plug-in vehicle

pricing design

earthworks

valet assistance

renovation work

conduit routing

fast charger

pump mounting

generator wiring

cost planning

IP networking

mobility aid

design oversight

terminal fitting

device charger

patch management

cost analysis

broadband access

commercial card

conduit laying

cable routing

cost evaluation

expense tracking

cost estimation

permit plans

transport tools

working plans

IT systems

building projects

meter board assembly

security system mount

virtual network delivery

electrical supplies

design cost analysis

fuel payment card

mechanical system setup

global internet backbone

site construction

electrical panel mount

documentation management

parking space monitoring

circuit installation

registry optimization

internal power grid

power outlet integration

control panel fitting

compliance analysis

short-term parking

structured car parking

general contracting

lighting circuit works

green mobility unit

construction drawings

composition testing

digital gateway services

fixture integration

transportation support

infrastructure projects

lighting consumables

parking bay erection

troubleshooting visit

system update schedule

clean energy vehicle

paid parking provision

battery recharger

rechargeable vehicle

parking lot construction

calibration service

construction work

structural construction

budgeting oversight

onsite repair support

electrical charger

lighting and power setup

instrument calibration

executive drawings

internet connectivity

cost audit services

equipment repair service

materials analysis

measurement consultancy

documentation control

event parking service

construction services

energy replenisher

civil engineering

performance tuning

project design planning

HVAC system setup

zero-emission transport

project cost control

electrical equipment

cost monitoring services

project QA supervision

battery-powered car

web infrastructure

project supervision

vehicle components

power system wiring

managed connectivity

electrical fittings

power cable installation

machinery mounting

digital solutions

configuration audit

conceptual budgeting

enterprise software

budget forecasting

urban park facilitation

substation cabling

disk health check

surface car park build

luminaire installation

wiring connection

auto park construction

laboratory testing

electrical machinery

maintenance reporting

business charge card

surface parking facility

application software

fleet payment card

transformer supply lines

security hardening

approved design sets

vehicle accessories

parking access provision

movement equipment

building construction

circuit breaker setup

project cost estimation

analytical services

consultancy testing

cable tray installation

switchgear commissioning

apparatus equipment

device installation

electric city car

electrical installation

detailed drawings

repair diagnostics

technical advisory

environmental analysis

emergency repair team

technical testing

backup verification

packaged applications

cost performance reports

cost feasibility study

transport equipment

financial tracking

approved blueprints

motor electrical systems

switchboard fitting

light fixture installation

building specification preparation

plant equipment installation

paved vehicle parking zone

electrical infrastructure

outdoor parking structure

electrical connection works

temporary power feed setup

testing protocol development

outlet and switch fitting

electrical accessories fitting

design preparation services

project record supervision

coordination of project documents

grounding rod installation

distribution board alignment

construction documentation

vehicle parking assistance

electrical network installation

commercial fit-out electrics

mechanical installation work

high/medium/low voltage supply systems

maintenance contract service

engine electrical equipment

record-keeping supervision

electrical systems fitting

electrical connection setup

power distribution systems

electrical wiring and fittings

vehicular parking development

electricity supply installation

internet access provisioning

electrical panel mounting

automotive electrical gear

online communication platforms

compliance documentation oversight

component replacement service

software package and information systems

compressor foundation alignment

parking availability service

open-air parking area work

electrical grid connection works

service schedule planning

vehicle electric apparatus

budget monitoring consultancy

switch and socket mounting

project admin supervision

supply feeder installation

electric-powered transport

preventive maintenance program

auxiliary transport systems

specification documentation

parking infrastructure build

conveyor belt installation

Tender Lot Details & Award Criteria

1 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

PIN

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

PIN

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk