Closed

LCC 082/22 - FASTER Project - Provision of Rapid Electric Vehicle Charging Infrastructure along the border counties in Ireland

Descriptions

The FASTER project is a joint cross border project across Scotland, the border Counties of Ireland and Northern Ireland to support the overarching ambition to transition to low carbon transport systems and to demonstrate how each of the three jurisdictions can provide early systems learning in relation to the electrification of transport. This PIN notice relates only to the component of the FASTER project being undertaken by Louth County Council the provision of 25 rapid charge units across the border counties in the Republic of Ireland.There are a total of seven project partners and 15 associate partners from across the three jurisdictions. The partnership will implement the physical rollout of 73 rapid charging stations in the programme area. Led by East Border Region Ltd. the project has considered the common policy ambition across Scotland, Ireland, and Northern Ireland, which is to transition to a low carbon transport system between now and 2040. One of the main barriers to the take up of these electric vehicles is the lack of public charging infrastructure and in particular rapid charging locations. The project aims to ensure that the availability of charging stations is not a major obstacle to Electric Vehicle (EV) market penetration with the proposal to carry out the design, analysis, procurement, installation, and operation of 73 Rapid Chargers (60kw per charger with the capacity to deliver 120kw where only one car is connected to the charger) across the three programme jurisdictions. There must be cross compatibility between the three jurisdictions which may be achieved using contactless card payments or other methods.The FASTER project has been awarded funding for the project’s capital costs from the European Union’s INTERREG VA Programme, managed by the Special EU Programmes Body (SEUPB). Further information about the FASTER project can be found at www.fasterevcharge.com

Timeline

Published Date :

1st Jul 2022 3 years ago

Deadline :

8th Aug 2022 3 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

fuel payment card

business charge card

commercial card

fleet payment card

electrical machinery

apparatus equipment

lighting consumables

electrical equipment

lighting fixtures

electrical supplies

electrical charger

device charger

portable charger

fast charger

battery recharger

engine electrical equipment

vehicle electric apparatus

motor electrical systems

automotive electrical gear

recharger unit

charging device

energy replenisher

transport equipment

vehicle components

mobility aids

logistics gear

vehicle accessories

transportation support

transport tools

auxiliary transport systems

conveyance items

movement equipment

electric vehicle

EV

battery-powered car

zero-emission transport

plug-in vehicle

electric city car

green mobility unit

rechargeable vehicle

electric-powered transport

clean energy vehicle

construction work

building construction

civil engineering

infrastructure projects

site construction

building sites

structural work

construction services

renovation work

public works

construction works

building projects

infrastructure

turnkey projects

structural construction

general contracting

site preparation

earthworks

parking lot construction

surface car park build

open-air parking area work

paved vehicle parking zone

parking infrastructure build

vehicular parking development

outdoor parking structure

auto park construction

parking bay erection

surface parking facility

electrical installation

building wiring

electrical systems fitting

internal power grid

circuit installation

electrical infrastructure

lighting and power setup

cable routing

electrical connection works

electrical network installation

electrical wiring and fittings

power cable installation

switchboard fitting

conduit laying

lighting circuit works

domestic wiring

commercial fit-out electrics

power system wiring

internal cabling

fixture integration

electrical fittings

device installation

switch and socket mounting

luminaire installation

electrical accessories fitting

panel mounting

light fixture installation

terminal fitting

power outlet integration

electrical connection setup

electricity supply installation

power distribution systems

substation cabling

supply feeder installation

transformer supply lines

electrical grid connection works

high/medium/low voltage supply systems

mechanical installation work

machinery mounting

plant equipment installation

mechanical system setup

software package and information systems

application software

IT systems

enterprise software

packaged applications

digital solutions

equipment repair service

preventive maintenance program

troubleshooting visit

onsite repair support

maintenance contract service

repair diagnostics

component replacement service

service schedule planning

emergency repair team

calibration service

patch management

configuration audit

performance tuning

log file cleanup

security hardening

registry optimization

disk health check

backup verification

system update schedule

maintenance reporting

motor install

pump mounting

HVAC system setup

switchgear commissioning

conveyor belt installation

generator wiring

control panel fitting

security system mount

compressor foundation alignment

electrical panel mount

electrical panel mounting

wiring connection

cable tray installation

circuit breaker setup

outlet and switch fitting

meter board assembly

grounding rod installation

conduit routing

distribution board alignment

temporary power feed setup

project design planning

cost estimation

budget forecasting

design preparation services

cost planning

conceptual budgeting

design cost analysis

project cost estimation

cost feasibility study

pricing design

cost analysis

project cost control

cost monitoring services

budgeting oversight

expense tracking

cost audit services

financial tracking

cost performance reports

budget monitoring consultancy

cost evaluation

construction drawings

working plans

specification documentation

permit plans

executive drawings

approved design sets

building specification preparation

detailed drawings

construction documentation

approved blueprints

project supervision

documentation control

design oversight

project record supervision

documentation management

project QA supervision

coordination of project documents

record-keeping supervision

compliance documentation oversight

project admin supervision

technical testing

analytical services

materials analysis

consultancy testing

laboratory testing

instrument calibration

environmental analysis

composition testing

purity testing

measurement consultancy

testing protocol development

compliance analysis

technical advisory

internet connectivity

online communication platforms

broadband access

IP networking

web infrastructure

digital gateway services

global internet backbone

managed connectivity

virtual network delivery

internet access provisioning

vehicle parking assistance

parking access provision

short-term parking

valet assistance

parking space monitoring

event parking service

urban park facilitation

structured car parking

parking availability service

paid parking provision

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

PIN

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

PIN

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors