Centrica plc's Cornwall Local Energy Market project (LEM) is an EU-funded initiative involving the development of a virtual energy marketplace. The trial provides homes and businesses with the technology and a software platform to buy and sell energy and flexibility to both the supply networks and the wholesale energy market. The project's overarching aim is to demonstrate that the electricity distribution network can facilitate an increased penetration of renewable / low carbon electricity generation by invoking novel strategies including flexibility. The LEM project will enable energy asset flexibility in the most constrained areas on the distribution network in Cornwall. To this end the project will install low carbon energy generation assets, such as natural gas CHP, renewable energy generation, storage, private wire networks, and demand-side response technologies into selected industrial and commercial premises in Cornwall. We require an Independent Connection Provider (ICP) to act as EPC contractor, providing design and installation work, contributing to a single 2.3 MW wind turbine construction project. The wind turbine will be located at Ventonteague, St Allen, Cornwall and will be owned by Cornwall Council. The Contractor will be responsible for five packages of construction work contributing to this 'smart grid' wind energy project together with commissioning and the necessary approvals of the connections infrastructure; these work packages are as follows: 1)Civils work within the site boundary including the access track, crane pad and construction compound. 2)Substation design, supply and equipment installation. 3)Contestable electrical HV (33 kV) connection work from substation to DNO Point of Connection. 4)Electrical HV (33 kV) connection work from wind turbine to substation including LV and communications. 5)Broadband internet connection to substation. Respondents to this ITT will be asked to quote separately for the ongoing maintenance and inspection provision for the equipment/infrastructure installed according to (2), (3) and (4). This element will not sit within the tender and will not be assessed within the tender scoring process but will be passed to Cornwall Council (the turbine owner) for information. Several documents provide detailed specifications pertaining to aspects of this work. These are given as appendices accompanying the full Invitation to Tender which will become available after you register your interest.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
51112200 - Installation services of electricity control equipment
45231400 - Construction work for electricity power lines
32560000 - Fibre-optic materials
31121300 - Wind-energy generators
71323100 - Electrical power systems design services
45251160 - Wind-power installation works
65410000 - Operation of a power plant
45232220 - Substation construction work
45223821 - Prefabricated units
51112100 - Installation services of electricity distribution equipment
31121320 - Wind turbines
32510000 - Wireless telecommunications system
45233226 - Access road construction work
31121330 - Wind turbine generators
32520000 - Telecommunications cable and equipment
Keywords
WTG
WLAN system
utility turbine
wind-energy unit
telecom hardware
wind power unit
wind generator
glass fibre
optical fibre
wind-gen unit
boiler operation
wind turbine
actuator wiring
turbine control
driveway paving
modern turbine
cordless telecom network
wireless telecom system
power grid erection
substation construction
power system design
access road paving
HMI screen mounting
connector road surfacing
sensor loop wiring
switchgear engineering
RF communication system
fiber-optic cables
fibre-optic components
prefab unit assembly
energy plant maintenance
cable infrastructure
power station management
thermal plant running
turbine tower build
wind-power installation
substation yard build
wind energy machine
renewable wind gen
electricity production
copper telecom cables
renewable grid design
control relay setup
wireless infrastructure
surge arrestor placement
control logic testing
overhead cable line work
standalone modular units
wind power generator
fibre-optic supplies
fibre-optic materials
prefab cabin works
housing unit assembly
wind generator build
electrical grid planning
feeder cable labeling
wind turbine generator
wind farm turbine
wind farm erection
modular room building
control system grounding
utility energy hub build
fuse panel integration
plant operation services
energy corridor build
wind energy turbine
PLC cabinet wiring
SCADA interface installation
underground cable jointing
prefab shelter construction
electric power line installation
electrical network consultancy
power system integration services
energy generation facility
service road surface works
electrical output management
high-voltage line construction
prefabricated accommodation unit
power distribution centre
wind turbine construction
network cabling components
distribution network energizing
transformer feeder connection
renewable turbine installation
switchgear facility erection
overhead transmission line build
wind energy infrastructure
telecommunications cables
transformer compound construction
overhead line terminations
emergency stop circuit installation
power infrastructure operation
onshore wind plant construction
isolation switch installation
control panel PLC mounting
electrical substation build
grid substation infrastructure
power infrastructure planning
electric conductor installation
wind energy facility setup
green power turbine installation
utility line installation
substation switchgear install
electrical distribution infrastructure
modular living unit build
power transmission structure
containerized module installation
high-voltage installation
electrical switchyard construction
power distribution layout
pole-mounted transformer setup
container modules construction
substation design engineering
electrical utility design
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :