Awarded
LPFT Further Competition Document Boiler Replacement - Beaconfield Centre
Descriptions
Following recent site inspections it has become necessary to replace the existing boilers in the basement boiler room at the Beaconfield Centre in Grantham. The existing boilers are reaching the end of their practical useable life, and is now exceeding the legal limit on emissions. There is currently 1no. Ideal Concord C330 Series gas boiler (96kW) supplying the building with heating, and 1no. Direct gas fired Andrews 32/40 water heater, approximately 145 litre storage Capacity, supplying 7 hot water sink/WHB outlets. The boiler and water heater are approximately 25+ years old, and approximately only 50-60% efficient
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors