Awarded
LSC2157 — Fire Safety Improvement Works (Palace of Westminster) PoW Basement Project.
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
The Main Works (principle) contractor is required to deliver Fire Safety Improvement Works to the basement of the Palace of Westminster (PoW) and which consist of: 1. The Design and Installation of fire safety improvement works within the basement of the Palace of Westminster to deliver the key life safety enhancements (as documented in list B of the Parliamentary Fire Safety Strategy) by 2018/19 and deliver the remaining life safety enhancements and additional features to improve property protection and business resilience (list C) by 2019/20. This is all works that is considered necessary to ensure a safe and secure working environment. 2. Supply, manage and implement sectional phased maintenance, final integrated coordinated maintenance regime for all fire safety systems and building works during contract period.The Authority may procure the subsequent ongoing maintenance of a system installed under the Works contract in 1 of the following ways: a) extension of the contract with the Main Contractor responsible for the Works in the first instance; b) novation of the Main Contractors sub-contractor/s; c) carry out further competition under a separate procedure for the purpose of appointing maintenance contractor to maintain systems installed under the Works contract.The basement fire safety project will include the following design and installation works within the Palace of Westminster basement:— Automatic high pressure water mist fire suppression system.— Automatic fire detection system.— Voice alarm and public address annunciation system.— Cable management containment systems.— Emergency lighting and lighting control system— New UK compliant escape signage.— Smoke clearance ventilation systems (post fire).LV electrical power systems serving; fire pumps, emergency lighting, fire detection, alarm systems and smoke ventilation systems equipment.Upgrade existing basement building fabric to form 7 fire compartments.Small electrical power services and provide spatial lighting upgrades to rooms housing smoke vent fan sets, VA/PA equipment, and fire suppression pump sets and tank rooms.Upgrade existing structure and fabric forming fire rated sub-compartments.Fire door restoration, hold open devices and control system.New buried drainage works.Existing and new fire rated sealing to fire safety systems penetrations through fabric and structure.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45343000 - Fire-prevention installation works
48952000 - Public address systems
35111500 - Fire suppression system
31625100 - Fire-detection systems
50700000 - Repair and maintenance services of building installations
71321000 - Engineering design services for mechanical and electrical installations for buildings
44423400 - Signs and related items
45300000 - Building installation work
45331210 - Ventilation installation work
31518200 - Emergency lighting equipment
31625000 - Burglar and fire alarms
Keywords
signs
metal signs
smoke detector
warning signs
evacuation lamp
backup lighting
safety signage
exit sign light
street signs
shop signs
burglar detector
MEP works
security alarm
fire alarm
signage panels
break-in alarm
HVAC servicing
display signs
ductwork fitting
emergency LED
reflective signs
heat sensor network
water system overhaul
sprinkler systems
directional signage
fire door installation
smoke curtain fitting
fire protection systems
fire detector system
paging zone manager
HVAC ventilation setup
building installation
MEP design services
event alert manager
technical fit-out
fire suppression system
boiler system tune
service integration
emergency light fixture
energy systems design
systems installation
fire alarm control panel
gas pipe leak fix
final construction stage
gas suppression systems
fire system units
M&E installation design
live sound routing tool
plumbing fixture repair
heating pump service
HVAC design consultancy
smoke detection unit
automatic fire suppression
airflow infrastructure build
speaker grouping interface
technical services layouts
building engineering design
emergency suppression systems
venue PA controller software
electrical design for buildings
distributed audio control
fire extinguishing system
interior infrastructure install
ventilation duct cleaning
fire prevention installation
interior system installation
electrical wiring diagnostics
sanitary installation maintenance
microphone feed distributor
mechanical & electrical planning
building services engineering
indoor air circulation installation
fire alarm system calibration
mechanical ventilation fitting
air exchange system install
emergency broadcast system software
fire suppression installation
volume normalization module
announcement scheduling system
flame barrier system setup
construction finish works
building service deployment
suppression control equipment
mechanical systems engineering
ventilation equipment installation
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :