LSC2157 — Fire Safety Improvement Works (Palace of Westminster) PoW Basement Project.

Descriptions

The Main Works (principle) contractor is required to deliver Fire Safety Improvement Works to the basement of the Palace of Westminster (PoW) and which consist of: 1. The Design and Installation of fire safety improvement works within the basement of the Palace of Westminster to deliver the key life safety enhancements (as documented in list B of the Parliamentary Fire Safety Strategy) by 2018/19 and deliver the remaining life safety enhancements and additional features to improve property protection and business resilience (list C) by 2019/20. This is all works that is considered necessary to ensure a safe and secure working environment. 2. Supply, manage and implement sectional phased maintenance, final integrated coordinated maintenance regime for all fire safety systems and building works during contract period.The Authority may procure the subsequent ongoing maintenance of a system installed under the Works contract in 1 of the following ways: a) extension of the contract with the Main Contractor responsible for the Works in the first instance; b) novation of the Main Contractors sub-contractor/s; c) carry out further competition under a separate procedure for the purpose of appointing maintenance contractor to maintain systems installed under the Works contract.The basement fire safety project will include the following design and installation works within the Palace of Westminster basement:— Automatic high pressure water mist fire suppression system.— Automatic fire detection system.— Voice alarm and public address annunciation system.— Cable management containment systems.— Emergency lighting and lighting control system— New UK compliant escape signage.— Smoke clearance ventilation systems (post fire).LV electrical power systems serving; fire pumps, emergency lighting, fire detection, alarm systems and smoke ventilation systems equipment.Upgrade existing basement building fabric to form 7 fire compartments.Small electrical power services and provide spatial lighting upgrades to rooms housing smoke vent fan sets, VA/PA equipment, and fire suppression pump sets and tank rooms.Upgrade existing structure and fabric forming fire rated sub-compartments.Fire door restoration, hold open devices and control system.New buried drainage works.Existing and new fire rated sealing to fire safety systems penetrations through fabric and structure.

Timeline

Published Date :

29th Sep 2015 10 years ago

Deadline :

N/A

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

signs

metal signs

smoke detector

warning signs

evacuation lamp

backup lighting

safety signage

exit sign light

street signs

shop signs

burglar detector

MEP works

security alarm

fire alarm

signage panels

break-in alarm

HVAC servicing

display signs

ductwork fitting

emergency LED

reflective signs

heat sensor network

water system overhaul

sprinkler systems

directional signage

fire door installation

smoke curtain fitting

fire protection systems

fire detector system

paging zone manager

HVAC ventilation setup

building installation

MEP design services

event alert manager

technical fit-out

fire suppression system

boiler system tune

service integration

emergency light fixture

energy systems design

systems installation

fire alarm control panel

gas pipe leak fix

final construction stage

gas suppression systems

fire system units

M&E installation design

live sound routing tool

plumbing fixture repair

heating pump service

HVAC design consultancy

smoke detection unit

automatic fire suppression

airflow infrastructure build

speaker grouping interface

technical services layouts

building engineering design

emergency suppression systems

venue PA controller software

electrical design for buildings

distributed audio control

fire extinguishing system

interior infrastructure install

ventilation duct cleaning

fire prevention installation

interior system installation

electrical wiring diagnostics

sanitary installation maintenance

microphone feed distributor

mechanical & electrical planning

building services engineering

indoor air circulation installation

fire alarm system calibration

mechanical ventilation fitting

air exchange system install

emergency broadcast system software

fire suppression installation

volume normalization module

announcement scheduling system

flame barrier system setup

construction finish works

building service deployment

suppression control equipment

mechanical systems engineering

ventilation equipment installation

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Awarded

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk