Closed

Lynemouth - Design, Manufacture and Installation of Lagoon Baffles

Descriptions

The Employer requires a pair of bespoke baffles to be designed, manufactured and installed in a lagoon located at Lynemouth Mine Water Treatment Scheme. The Lynemouth Phase I mine water treatment scheme (MWTS) is located on the Northumberland coast on the site of the former Ellington Colliery. Coal mine water is abstracted at a rate of circa. 115 L/s from an abandoned mine shaft, treated through two lagoons configured in series before being discharged into the sea. The lagoons are constructed in colliery spoil and lined with an HDPE liner. The treatment process is designed to reduce total iron in the effluent which presents as ochre sludge in the lagoons; the mine water is currently subject to peroxide dosing. Lagoons are taken off line periodically (24 month intervals) to remove sludge by means of pumping. The site is in a remote location there being no permanent welfare facilities on the site. The employer intends to install two baffles in lagoon No 1 in order to optimise: •mean residence time; •longitudinal mixing characteristics; •reaction and settlement of ochre within the lagoon.

Timeline

Published Date :

6th Sep 2019 5 years ago

Deadline :

20th Sep 2019 5 years ago

Contract Start :

30th Sep 2019

Contract End :

31st Jan 2020

Tender Regions

CPV Codes

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors