Closed

Manchester Airport Group Vertical Transportation Framework

Descriptions

MAG Framework – New install / RefurbishmentThe provision of the MAG Framework is indicative and based on future requirements of all three MAG UK Airport locations which will include, New install / Refurbishment Specification for a minimum period of 3 years. The New install / Refurbishment work will be carried out in line with the capital expenditure Programme.The scope of these works includes but is not limited to design, supply, install, test, commissioning of new elevators, escalators and auto walkways as well as decommissioning identified Elevators and Escalators. All works where possible will be carried out using Modern Methods of Construction (MMC) and Design for Manufacture & Assembly (DfMA) solutions of modularisation and prefabrication.There is an immediate requirement which will form the basis of commercial evaluation of the Framework.Terminal 2 Reconfiguration8 New Elevators in new Shafts4 New Elevators in Existing Shafts6 New Escalators4 Decommissioning and Removal of Existing Elevators2 Decommissioning and Removal of Existing EscalatorsIn addition to the outline Terminal 2 Reconfiguration scope, Contractors will be requested to provide value engineering options to modernise 4 existing Elevators and 2 Escalators in the Terminal 2 area.Pier 2 Phase 211 Node passenger Elevators (3 Storey)1 Node passenger Elevator (2 Storey)1 Pier gate Elevator (2 Storey)1 Pier CIP Passenger Elevator (2 Storey)1 Pier Goods Elevator (3 Storey) *requirement for beneficial Construction use on temporary power.

Timeline

Published Date :

23rd Aug 2022 3 years ago

Deadline :

19th Sep 2022 3 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

lifts

elevators

passenger lifts

goods lifts

bath lifts

service lifts

wheelchair lifts

residential elevators

hydraulic lifts

traction elevators

freight lift

goods elevator

service lift

industrial lift

platform lift

cargo hoist

warehouse lift

dumbwaiter

stock elevator

heavy-load lift

mechanical lift

rack-and-pinion lift

screw lift

chain-driven lift

manual mechanical elevator

non-electric lift

low-tech elevator

gear-driven lift

shaft lift

escalator

moving staircase

moving steps

public escalator

mall escalator

metro escalator

outdoor escalator

incline escalator

travelator escalator

indoor escalator

moving walkway

travelator

moving sidewalk

airport walkway

flat escalator

horizontal moving platform

people mover

transport walkway

pedestrian conveyor

walkway system

industrial elevator

material conveyor

bulk handling system

vertical lift

conveyor belt system

factory elevator

goods transport system

continuous conveyor

warehouse elevator

inclined conveyor

lift parts

skip hoist spares

escalator components

elevator carriage part

escalator step

hoist chain spare

elevator motor part

escalator handrail

escalator comb plate

lift door mechanism

elevator parts

lift controller spare

elevator doors

elevator cable part

carriage guide shoe

counterweight part

elevator pulley

traction sheave

elevator shaft component

lift safety gear

escalator parts

step chain link

handrail part

escalator motor

escalator roller

comb plate

escalator comb

escalator step conversion

escalator guide

moving walkway parts

travelator belt part

walkway step replacement

walkway motor

walkway roller

walkway comb plate

walkway handrail

walkway drive module

walkway belt

passenger conveyor spare

air transport building construction

airport facility build

aviation infrastructure erection

hangar and terminal build

aviation support structure construction

airport office build

passenger terminal building works

tarmac service building erection

runway facility structures

flight operations centre construction

step chain lubrication

handrail drive servicing

safety brake adjustment

step alignment check

escalator belt replacement

motor control diagnostics

emergency stop test

skirt panel tightening

step light repair

escalator speed calibration

elevator door sensor calibration

hoist rope inspection

control system firmware update

brake pad replacement

lift gearbox oil change

weight load testing

safety circuit diagnostics

cabin lighting fix

emergency phone testing

lift alignment service

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Framework

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors