Closed
Manufacture of Walkway for No. 2 Dock, Portsmouth Historic Dockyard
Descriptions
Fabrication of a metal mesh walkway to take visitors from HMS Victory ship exit, horizontally along dock steps. Fabrication of bespoke metal staircase to lead down to dock bottom. Fabrication of a second walkway to run along the dock bottom. Fabrication of handrails for existing stone stairs, as emergency egress. All to be built to the specification of the architects' design.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45223110 - Installation of metal structures
45262670 - Metalworking
45255400 - Fabrication work
45223100 - Assembly of metal structures
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors