Closed
Mare Harbour Roll On Roll Off (Ro-Ro) Facility Upgrade and Refurbishment at the East Cove Military P
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Designs. Marine construction works. Ferry terminal building construction work. To undertake all design and build tasks associated with upgrade and refurbishment of the Mare Harbour Ro-Ro Facility for continued use by the Falklands Island Re-Supply Ships (FIRS) Point Class vessels detailed below:— To provide Mare Harbour Falkland Islands with a RO-RO facility suitable to cater for berthing, mooring and offloading of the FIRS Point Class vessels;— To provide Mare Harbour Falkland Islands with a facility that is capable of supporting Small Boat Operations.In order to meet these Requirements, the Works to be executed under this Contract shall include, but not be limited to, the design, construction, installation, testing, commissioning and remedying of defects of the following items:Works including, amongst other requirements:— Provision of a quay structure to act as a berthing face for the safe berthing of the FIRS Point Class RO-RO vessels;— Provision of supporting quay structures for mooring points to enable safe mooring;— Provision of pedestrian access gangways between the existing T-head jetty, the mooring points and the berthing face;— Provision of Fendering and mooring equipment, and safety equipment;— Minor repair to the quay face at the stern ramp for the RO-RO;— Cathodic protection to all existing sheet piled structures (including the T-head jetty), where these are retained for use in the facility;— Provision of a new small boats jetty comprising a pontoon on piled moorings and a linkspan, to support small boat operations;— Associated M&E services;— Demolition and disposal of existing structures where these are not re-used.The design must consider the significant logistical and environmental constraints which are present at operational ports. The requirement is for a 25 year design life for all elements of this project. All designs are to comply with relevant EU, UK and FI legislation.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
22314000 - Designs
45213341 - Ferry terminal building construction work
45244000 - Marine construction works
Keywords
ferry hub build
print layouts
marine piling
template artwork
graphic designs
offshore infrastructure
sea structure build
marine construction
aquatic construction
ferry docking facility
coastal marine works
ferry port building
printed design services
digital design prints
port marine projects
maritime civil works
underwater engineering
ferry terminal construction
ferry terminal infrastructure
marine boarding structure
inter-island terminal building
sea transport terminal construction
maritime passenger terminal
roll-on/roll-off ferry terminal erection
submerged structure erection
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :