Closed
Market Engagement - Highways Maintenance Future Requirements
Descriptions
Description of intended Highways Maintenance requirements - the current Highway Term Maintenance Contract will be split into four separate contracts:, •Core Term Maintenance – Undertaking of core highway maintenance activities. This includes: the repair of safety defects; out-of-hours call handling and response to highways emergency incidents and support to the emergency services, including on the public rights of way network; delivery of winter service activities, including the purchase of de-icing materials, using the Employer’s fleet; Installation and maintenance of non-illuminated signage, road markings and studs; grass cutting, hedge cutting, tree maintenance, weed killing; road edge ploughing, clearance of ditches and drainage grips; planned and reactive cleaning of highway drainage systems including gully emptying, drain jetting and clearance of outfalls; repairs and improvements to highway drainage systems; repairs and resurfacing of footways and cycleways, carriageway patching; minor repairs to bridges, walls and other highway structures; testing and site investigation work - approximate total value of £150,000,000 and duration of 8 years + opportunity to extend for a further 4 year period., •Surfacing – Reconstruction, overlay and resurfacing of carriageways. Also, the laying of thin overlay surfacings and other surface treatments, retexturing, crack sealing, high friction surfacing etc to carriageways, footways and cycleways approximate total value of £25,000,000 and duration of 4 years., •Surface Dressing – Design and laying of surface dressings to carriageways in accordance with Road Note 39. Also, the laying of thin overlay surfacings to carriageways, footways and cycleways - approximate total value of £25,000,000 and duration of 4 years., •New Assets – These include Small Improvement Schemes, Safety Schemes, Active Travel Schemes, Bus Service Improvement Plan Schemes etc, and may extend to schemes funded/ promoted by third parties. They are a mix of schemes promoted by elected members and officers and can vary in size up to around £1,000,000 but an upper limit for an individual scheme will not be set. Typical schemes may involve new footways/ cycleways, crossings, speed reduction/traffic management measures, junction re-alignments. The nature of the work will include drainage, kerbing, carriageway/ footway/ cycleway construction, high friction surfacing, signing, road marking and studs, illuminated signage, highway lighting & signals (option to procure directly) - approximate total value (subject to successful bids for funding) in the range of £10,000,000 to £20,000,000 and duration of 4 years., The Authority is publishing this PIN to inform the market of its future intentions regarding the above., A Market Engagement Event will be hosted online by Somerset County Council on 28th February 2022. Suppliers who wish to participate in this information sharing session will need to register their interest through the listing posted on the Supplying the South West portal, reference DN584103 (www.supplyingthesouthwest.org.uk), to receive the event link to be hosted through Microsoft Teams. Suppliers should use the messaging function on the portal to request the meeting link., The Market Engagement Event is intended for the Authority’s officers to share information with regards to these contracts and the future options for procurement and delivery. In addition to this, the Authority will be offering one-to-one sessions to suppliers following the event who have further questions or feedback to provide to the Authority., The Draft Agenda for the Market Engagement Event will be as follows:, •Introducing the Day, •High Level Commissioning Intensions, •The Structure/Scope of the Contracts, •Procurement Timetable, •Introduction to Service Delivery, •Highway Maintenance Service Delivery, •Highway New Assets Service Delivery, •Wrap Up Session, Following the Market Engagement Event, opportunities for one-to-one discussions will be offered - March 2022 to April 2022., Attendance or non-attendance will not prejudice any supplier’s participation in any subsequent procurement exercises. The slides, information presented, and any questions & responses provided will be made available following the event.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45112210 - Topsoil-stripping work
77340000 - Tree pruning and hedge trimming
34928450 - Bollards
45232452 - Drainage works
34929000 - Highway materials
45233220 - Surface work for roads
71322000 - Engineering design services for the construction of civil engineering works
90630000 - Ice-clearing services
45233100 - Construction work for highways, roads
34922100 - Road markings
77300000 - Horticultural services
34928200 - Fences
71313440 - Environmental Impact Assessment (EIA) services for construction
45233310 - Foundation work for highways
45112100 - Trench-digging work
71311210 - Highways consultancy services
45233270 - Parking-lot-surface painting work
45233251 - Resurfacing works
45233252 - Surface work for streets
45316000 - Installation work of illumination and signalling systems
44113810 - Surface dressing
34990000 - Control, safety,signalling and light equipment
45233292 - Installation of safety equipment
45233130 - Construction work for highways
45233291 - Installation of bollards
45112730 - Landscaping work for roads and motorways
90620000 - Snow-clearing services
45233253 - Surface work for footpaths
71521000 - Construction-site supervision services
45111250 - Ground investigation work
45233290 - Installation of road signs
45233293 - Installation of street furniture
45233161 - Footpath construction work
45233228 - Surface coating construction work
45233162 - Cycle path construction work
45233139 - Highway maintenance work
45233294 - Installation of road signals
34928470 - Signage
45233128 - Roundabout construction work
45111200 - Site preparation and clearance work
90641000 - Gully cleaning services
34928320 - Guardrails
63712200 - Highway operation services
45233210 - Surface work for highways
45233141 - Road-maintenance works
34928300 - Safety barriers
45233300 - Foundation work for highways, roads, streets and footpaths
Keywords
road markings
pavement markings
lane markings
road paint
road stripes
traffic line markings
highway markings
street markings
pavement line systems
road surface markings
fences
security fencing
perimeter fences
roadside fences
wire mesh fences
fence panels
protective fences
highway fencing
barrier fencing
fence systems
safety barriers
crash safety barriers
vehicular safety fences
highway safety barriers
roadside safety rails
protective barriers
crash protection fencing
impact safety barriers
roadside crash barriers
guardrails
road guardrails
highway guardrails
vehicular guardrails
crash guardrails
roadside guard rails
steel guardrails
metal guard rails
safety guardrails
bollards
traffic bollards
street bollards
safety bollards
vehicle barriers
pedestrian bollards
parking bollards
post barriers
security bollards
urban bollards
signage
road signs
traffic signs
highway signage
street signage
informational signs
directional signs
road sign plates
sign panels
urban signage
highway materials
road construction materials
asphalt
concrete highway supplies
pavement materials
road-building supplies
highway aggregates
bituminous materials
road base materials
highway surfacing materials
control safety signalling and light equipment
safety equipment
signalling equipment
control equipment
lighting equipment
traffic control systems
safety signal systems
control lighting instruments
signalling and light fixtures
traffic safety gear
surface dressing
road chip seal
road surface treatment
tar-and-chip surfacing
bituminous surface binders
site clearance
vegetation removal
land preparation
topsoil stripping
site cleanup
ground clearing
demolition clearance
surface preparation
vegetation clearing
site readiness
ground investigation work
geotechnical surveys
site investigation
borehole drilling
soil sampling
subsoil testing
foundation analysis
ground assessment
geotech testing
ground surveys
trench‑digging work
trench excavation
utility trenching
service trench digging
pipeline trenching
cable trenching
drainage trench digging
trench installation
narrow trench excavation
subsurface trenching
topsoil‑stripping work
topsoil removal
fertile layer stripping
grass topsoil excavation
vegetation layer removal
nutrient soil clearance
agricultural topsoil digging
field topsoil removal
topsoil preparation
roadside landscaping
motorway verge planting
highway landscape design
roadside greenery work
motorway planting
roadway beautification
highway embankment landscaping
median strip landscaping
transportation corridor greenery
highway environmental works
drainage construction
stormwater ditch building
surface water pipeline installation
channel excavation works
groundwater diversion build
urban storm channel works
drainage trench construction
rainwater conduit installation
culvert drainage build
hydrological surface works
road construction
highway building
expressway erection
arterial road installation
trunk road build
vehicular corridor construction
road pavement works
intercity road construction
roadway infrastructure build
transport highway construction
roundabout build
traffic circle construction
rotary junction build
gyratory roundabout works
circular intersection construction
road roundabout erection
traffic-calming circle build
intersection roundabout paving
landscaped roundabout build
rotary junction infrastructure
highway construction
expressway build
freeway infrastructure works
national highway construction
motorway corridor build
trunk road construction
controlled-access highway erection
multi-lane highway works
major route construction
road-based transport corridor build
highway maintenance work
road upkeep services
motorway repair operations
expressway surface maintenance
carriageway upkeep
road restoration services
highway resurfacing work
maintenance of federal roads
roadway upkeep projects
highway rehab works
road-maintenance works
periodic road repair
asphalt patching
pothole repairs
road surface upkeep
preventative roadway maintenance
carriageway maintenance
road sealing works
highway maintenance services
roadway upkeep tasks
footpath build
pedestrian walkway installation
sidewalk construction
pavement surfacing
pedestrian path erection
walkway paving works
walkway network development
public footpath construction
sidewalk slab installation
curb path build
cycle path installation
bike lane surfacing
bicycle track build
cycleway construction
dedicated cycling infrastructure
commuter bike route build
urban cycle network path
bike trail surfacing
cycle corridor construction
pedalway build
highway surfacing
motorway surfacing
expressway paving
road overlay for highways
bituminous highway surface treatment
road surfacing
rural road paving
urban road overlay
bituminous road surface works
carriageway surface operations
surface coating
coating works
overlay coating
protective surface coating
surface sealant application
bituminous coating
concrete coating
decorative coating
wear-resistant surface
road coating
resurfacing
surface renewal
overlay works
pavement restoring
surface rejuvenation
layer replacement
surface rehabilitation
worn-surface overlay
maintenance resurfacing
highway resurfacing
street surfacing
urban street paving
residential street coating
asphalt street works
city street surfacing
town road surface
street pavement
municipal street overlay
paved street repair
street surface upgrade
footpath surfacing
sidewalk paving
pedestrian path overlay
walkway surfacing
pavement for pedestrians
footway coating
concrete footpath works
asphalt sidewalk
pedestrian surfacing
curb pathway surfacing
parking lot marking
car park painting
parking space marking
bay marking
asphalt parking lines
parking lot coating
directional painting
reserved spot painting
lot striping
parking zone paint
road sign installation
traffic signage fitting
highway sign setup
regulatory sign placement
directional sign mounting
traffic sign erection
street sign placement
road marking signage
bollard installation
safety bollard fitting
traffic bollard mounting
pedestrian bollard placement
anti‑ram bollards
parking bollard installation
street bollard works
protective post fitting
safety equipment installation
roadside safety gear fitting
reflective post installation
vehicle restraint system setup
traffic safety device mounting
road safety equipment works
street furniture installation
benches mounting
urban furniture fitting
street bench installation
bus stop fitting
litter bin placement
public seating installation
urban fixtures
road signal installation
traffic light fitting
intersection signal setup
pedestrian crossing signals
traffic light system installation
signal head mounting
foundation construction
road base works
subgrade preparation
infrastructure groundwork
pavement foundation
highway footing works
street foundation installation
highway foundation works
motorway base construction
expressway substructure
carriageway base layer
highway groundworks
roadbed foundation
illumination system installation
lighting and signal setup
electrical street lighting installation
signal equipment fitting
public lighting and signalling works
motorway management service
toll motorway upkeep
expressway maintenance coordination
highway system operation
motorway service oversight
road network control
motorway safety support
expressway traffic assistance
highway infrastructure operations
carriageway management
roadway consultancy
highway engineering advice
road design consulting
traffic flow consultancy
highway infrastructure planning
pavement engineering consulting
road safety advisory
highway project consultancy
road network optimization
highway policy consulting
construction EIA services
environmental impact assessment
EIA reports for building
site ecology study
project environmental evaluation
construction EIA consultancy
habitat impact study
regulatory EIA compliance
environmental assessment surveying
building site EIA
civil engineering design
infrastructure blueprint services
structural planning
public works engineering
road and bridge design
waterworks design
utility infrastructure planning
technical civil design
construction engineering consultancy
civil project technical design
site activity monitoring
daily field inspection
HSE compliance oversight
subcontractor coordination
progress photo documentation
punch list management
crew task verification
incident logging
equipment deployment supervision
work package sign-off
security zone oversight
temporary works checks
logistic routing on site
confined space supervision
contractor interface control
horticultural services
gardening
greenhouse operations
ornamental planting
landscape cultivation
plant propagation
horticulture maintenance
nursery operations
garden design support
horticultural care
tree pruning and hedge trimming
arboriculture
shrub maintenance
hedge shaping
tree care pruning
landscape trimming services
decorative hedge cutting
crown thinning
structural pruning
snow removal
road de-icing
winter road maintenance
snow plowing
urban snow clearance
sidewalk snow service
ice melting
community snow cleanup
winter debris removal
municipal snow clearing
ice removal
anti-icing
frozen road clearing
de-icing pavement
ice-breaking service
winter surface maintenance
icy sidewalk clearance
mechanical ice removal
road safety de-ice
iced surface cleanup
drain cleaning
gutter debris removal
catchpit wash
urban drain maintenance
rainwater drain cleaning
environmental drain service
stormwater drain clearing
municipal gutter care
gully debris cleanup
drain clearing
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors