Maxwell Building 7th Floor Asbestos Remediation Project

Descriptions

The University is the single occupier of the Maxwell building. The building houses professional services, teaching spaces and a canteen located on the ground floor. The building is located centrally on the Peel Park campus and operates as the main campus reception. The Think Lab is located on the 7th floor, which is made up of staff offices and teaching rooms. The University have been unable to access a number of ceiling voids throughout the 7th floor, due to the presence of asbestos containing materials in varied condition. The University are proposing to remove asbestos containing materials and undertake an environmental clean of a number of ceiling voids on the floor. The project will briefly consist of: • Protection of all retained surface finishes and building elements as required both within and outside work areas. • Asbestos removal and remediation works, including associated analytical air monitoring • Strip out of existing ceilings • Alterations to the existing mechanical and electrical systems • Installation of new ceiling systems • Internal decorations • Making good and commissioning works.

Timeline

Published Date :

17th Apr 2025 2 days ago

Deadline :

7th May 2025 in a 18 days

Contract Start :

N/A

Contract End :

N/A

Tender Regions

CPV Codes

Tender Lot Details

1 Tender Lot

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors